Flood Control and Drainage23GB0025

CONSTRUCTION OF ANTIQUE BREAKWATER STRUCTURE ALONG BARANGAY MAYBATO SOUTH TO BARANGAY MAYBATO NORTH

CONSTRUCTION OF ANTIQUE BREAKWATER STRUCTURE ALONG BARANGAY MAYBATO SOUTH TO BARANGAY MAYBATO NORTH is a DPWH-tracked public work in Antique DEO, Region VI. Reported contract value: ₱90,800,000.00. Status: Past target date (DPWH On-Going). Contractor on record: IBC INTERNATIONAL BUILDERS CORP. Figures trace to dpwh.

Antique DEO, Region VI
Region: Region VI

Satellite images pending: this project is in the imagery queue (completed projects first, then ongoing). Before/after images will appear here when it is processed.

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱15,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23GB0025 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    91% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Antique

Based on the coordinates published with the DPWH record and NOAH file Antique.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ANTIQUE BREAKWATER STRUCTURE ALONG BARANGAY MAYBATO SOUTH TO BARANGAY MAYBATO NORTH

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Binangbang River, Barangay Poblacion, Barbaza, Antique
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Antique DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

4. Implementation

Contract Amount

₱90,800,000.00

Progress

Past target date (DPWH On-Going)

Start Date

February 9, 2023

Target End

January 23, 2024

5. Audit