Buildings and Facilities23FM0047

CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOMS SCHOOL BUILDING, COSTA RICA INTEGRATED SCHOOL.

CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOMS SCHOOL BUILDING, COSTA RICA INTEGRATED SCHOOL. is a DPWH-tracked public work in Masbate 1st DEO, Region V. Reported contract value: ₱5,909,832.30. Status: Reported complete (DPWH). Contractor on record: CL CARANDANG CONST AND SUPPLY CORP FORMERLY: CL CARANDANG ENT. Figures trace to dpwh.

Masbate 1st DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱24,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23FM0047 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-08-07 → 2025-10-24

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOMS SCHOOL BUILDING, COSTA RICA INTEGRATED SCHOOL.

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱24,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure (Upstream), Brgy. Progreso, San Fernando, Masbate
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Masbate 1st DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

194 projects · ₱2.4B total · 0 flags

Other projects by this contractor

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SAN RAMON RIVER, USON, MASBATE

Masbate 3rd DEO, Region V

2024₱96.4M
Reported complete (100% progress, DPWH status On-Going)

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BATUILA RIVER, BALENO, MA

Masbate 2nd DEO, Region V

2025₱85.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY ROADS, MASBATE- CATAINGAN- PLACER ROAD, K0070+485- K0072+870

Masbate 3rd DEO, Region V

2019₱67.4M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF MASBATE CITY PORT-COASTAL ROAD (DIVERSION ROAD). MASBATE CITY, MASBATE

Masbate 2nd DEO, Region V

2022₱64.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS - BALUD - PALANI - PANUBIGAN - PAJO - TALISAY ROAD LEADING TO PALANI BEACHES, PANUBIGAN, PAJO AND TALISAY MANGROVE AREA, BRGY. TALIS

Masbate 2nd DEO, Region V

2020₱61.6M
Reported complete (DPWH)
No sat.

ROAD WIDENING - ALONG MINDORO WEST COASTAL RD ( S00095MR) K0231+556 - K0233+216, SAN JOSE, OCC. MINDORO

Mindoro Occidental DEO, Region IV-B

2019₱49.0M
Reported complete (DPWH)
View all 194 projects →

4. Implementation

Contract Amount

₱5,909,832.30

Progress

Reported complete (DPWH)

Start Date

August 7, 2023

Target End

November 4, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.