Construction of Slope Protection along Jct. (TER) Guidulman - Anda - Badiang - Cogtong Road, Sta. 22+647-Sta. 22+695 (Left Side), Sta. 22+640-Sta.22+740 (Right Side),Sta. 24+040-Sta. 24+140 (Left Side), Sta. 24+250-Sta. 24+266 (Left Side), Anda , Bohol
Construction of Slope Protection along Jct. (TER) Guidulman - Anda - Badiang - Cogtong Road, Sta. 22+647-Sta. 22+695 (Left Side), Sta. 22+640-Sta.22+740 (Right Side),Sta. 24+040-Sta. 24+140 (Left Side), Sta. 24+250-Sta. 24+266 (Left Side), Anda , Bohol is a DPWH-tracked public work in ANDA (BOHOL), BOHOL, Region VII. Reported contract value: ₱76,929,652.14. Status: Reported complete (DPWH). Contractor on record: JAS MIXER CONST AND DEVELOPMENT CORP / M R VARGAS CONST CORP FORMERLY: M R VARGAS CONST. Figures trace to sumbong.
Total Contract Cost