CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), BHS CALAPI, MOTIONG, SAMAR
CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), BHS CALAPI, MOTIONG, SAMAR is a DPWH-tracked public work in Samar 2nd DEO, Region VIII. Reported contract value: ₱485,082.53. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: BCG DESIGN AND CONST. Figures trace to dpwh.
Total Contract Cost
