Flood Control and Drainage21FN0063

CONSTRUCTION/IMPROVEMENT OF RIVERBANK SLOPE PROTECTION ALONG WARAS RIVER, UPSTREAM OF WARAS BRIDGE, SAN JUAN-BAGUMBAYAN, BAAO, CAMARINES SUR STA. 15+963.00 STA. 16+230.00

CONSTRUCTION/IMPROVEMENT OF RIVERBANK SLOPE PROTECTION ALONG WARAS RIVER, UPSTREAM OF WARAS BRIDGE, SAN JUAN-BAGUMBAYAN, BAAO, CAMARINES SUR STA. 15+963.00 STA. 16+230.00 is a DPWH-tracked public work in Camarines Sur 5th DEO, Region V. Reported contract value: ₱33,514,614.41. Status: Reported complete (DPWH). Contractor on record: RAMARPLUS INC FORMERLY RAMAR ENT 8092. Figures trace to dpwh.

Camarines Sur 5th DEO, Region V
Region: Region V

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱29,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Waras River, Downstream Imban Bridge, San Antonio Poblacion, Nabua, Camarines Sur
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Camarines Sur 5th DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 8092

59 projects · ₱4.1B total · 0 flags

Other projects by this contractor

No sat.

MFO1-NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT: CONST. OF MISSING GAPS CONNECTING NATIONAL ROADS, INCLUDING ROW, BACON-MANITO ROAD, ROAD COMPONENTS (BRGY. OSIAO-BRGY. STO. NIÑO),SORSOGON 1ST LD, BACON, SORSOGON PROVINCE

Region V, Region V

2016₱183.3M
Reported complete (DPWH)

REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (SAN ISIDRO - SAGRADA SECTION), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT

Region V, Region V

2020₱181.5M
Reported complete (DPWH)

REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (SAN JOSE-SAN ISIDRO SECTION), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT

Region V, Region V

2020₱181.3M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG SOLONG RIVER, BRGY. LIBOD, CAMALIG, ALBAY, CAMALIG, ALBAY (2ND LEGISLATIVE DISTRICT)

Region V, Region V

2024₱173.7M
Past target date (DPWH On-Going)

ORGANIZATIONAL OUTCOME 2- PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PINANGANURAN RIVER FLOOD CONTROL STRUCTURE ALONG SPILLW

Albay 3rd DEO, Region V

2024₱144.8M
Reported complete (DPWH)
No sat.

OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD MITIGATION STRUCTURE AT TIBU RIVER, LEGAZPI CITY, ALBAY 2ND LEGISLATIVE DIST

Region V, Region V

2022₱144.7M
Past target date (DPWH On-Going)
View all 59 projects →

4. Implementation

Contract Amount

₱33,514,614.41

Progress

Reported complete (DPWH)

Start Date

February 26, 2021

Target End

September 25, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.