Water Provision and Storage23FH0052

CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTORS - WATER SUPPLY SYSTEM, CONSTRUCTION OF SOLAR WATER SYSTEM, PANGANIBAN, CATANDUANES.

CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTORS - WATER SUPPLY SYSTEM, CONSTRUCTION OF SOLAR WATER SYSTEM, PANGANIBAN, CATANDUANES. is a DPWH-tracked public work in Catanduanes DEO, Region V. Reported contract value: ₱9,790,754.87. Status: Reported complete (DPWH). Contractor on record: TRI-JOHN TRADING. Figures trace to dpwh.

Catanduanes DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱5,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23FH0052 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-06-15 → 2017-06-15

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTORS - WATER SUPPLY SYSTEM, CONSTRUCTION OF SOLAR WATER SYSTEM, PANGANIBAN, CATANDUANES.

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control at Sibacungan, Bato, Catanduanes
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Catanduanes DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

30 projects · ₱248.6M total · 0 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES-SECONDARY ROAD CATANDUANES CIRCUMFERENTIAL ROAD, K0146+800-K0146+850, CARAMORAN, CATANDUANES

Catanduanes DEO, Region V

2020₱20.6M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION - REHAILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, JCT. CATANDUANES CIR ROAD - PANGANIBAN-SABLOYON ROAD K0057+075 - K0057+689

Catanduanes DEO, Region V

2022₱19.6M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION -CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS -SECONDARY ROADS - JCT. CATANDUANES CIRCUMFERENTIAL ROAD - PANGANIBAN-SABLOYON ROAD K0060+000 -K0061+443

Catanduanes DEO, Region V

2022₱19.6M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION - CONSTRUCTION/UPGRADING OF DRAINAGE ALONG NATIONAL ROAD TERTIARY ROADS, BARAS-GIGMOTO-VIGA ROAD, K0060+658-K0060+941, K0061+000-K0061+500, K0064+144-K0064+829

Catanduanes DEO, Region V

2020₱18.9M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-REHABILITATION OF CONCRETE ROAD-REHABILITATION/IMPROVEMENT OF BRGY. CALATAGAN TIBANG BIGAA ROAD LEADING TO

Catanduanes DEO, Region V

2021₱17.6M
Reported complete (DPWH)
No sat.

CLUSTER II-CONSTRUCTION OF MULTI-PURPOSE BUILDING IN THE MUNICIPALITY OF SAN MIGUEL, PANGANIBAN AND BAGAMANOC, CATANDUANES

Catanduanes DEO, Region V

2019₱12.6M
Reported complete (DPWH)
View all 30 projects →

4. Implementation

Contract Amount

₱9,790,754.87

Progress

Reported complete (DPWH)

Start Date

July 28, 2023

Target End

January 17, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.