Roads21GA0093

ROAD WIDENING ALONG AKLAN WEST ROAD (KALIBO-NABAS) K0252+500-K0253+000 PANAYAKAN, TANGALAN, AKLAN K0252+500-K0253+000

ROAD WIDENING ALONG AKLAN WEST ROAD (KALIBO-NABAS) K0252+500-K0253+000 PANAYAKAN, TANGALAN, AKLAN K0252+500-K0253+000 is a DPWH-tracked public work in Aklan DEO, Region VI. Reported contract value: ₱12,858,068.89. Status: Reported complete (DPWH). Contractor on record: AUDRIC CONST. Figures trace to dpwh.

Aklan DEO, Region VI
Region: Region VI

Follow the peso

2 of 5 steps linked from public records. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱19,250

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    Not yet linked

  3. 3. PhilGEPS award

    Not yet linked

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-07-03 → 2025-07-28

    Same record (DPWH contract ID)

    DPWH source ↗
  5. 5. COA audit finding

    Not yet linked

Unit-cost benchmark · Road, cost per km (widening)

₱12,858,069 per km= 0.4x the Region VI median (n=261)

Contract cost ₱12,858,069 ÷ 1 km read from the DPWH title (“K0252+500-K0253+000; K0252+500-K0253+000”; K-post / station range length). National percentile: 2. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱19,250,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Aklan River, Tigayon, Kalibo, Aklan
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Aklan DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

4. Implementation

Contract Amount

₱12,858,068.89

Progress

Reported complete (DPWH)

Start Date

March 11, 2021

Target End

July 21, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.