Flood Control and Drainage24AA0367

BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF DRAINAGE CANAL ALONG RIZAL BOULEVARD AND QUIRINO BOULEVARD, BRGY. 6 SAN PEDRO I, BACARRA, ILOCOS NORTE

BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF DRAINAGE CANAL ALONG RIZAL BOULEVARD AND QUIRINO BOULEVARD, BRGY. 6 SAN PEDRO I, BACARRA, ILOCOS NORTE is a DPWH-tracked public work in Ilocos Norte 1st DEO, Region I. Reported contract value: ₱4,797,817.80. Status: Past target date (DPWH On-Going). Contractor on record: TMT CONST. Figures trace to dpwh.

Ilocos Norte 1st DEO, Region I
Region: Region I

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Padsan River and Tributaries, Construction of Integrated Drainage Canal, Brgy. 23 - Brgy. 29 Laoag City, Ilocos Norte
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Ilocos Norte 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

172 projects · ₱862.4M total · 1 flags

4. Implementation

Contract Amount

₱4,797,817.80

Progress

Past target date (DPWH On-Going)

Start Date

April 1, 2024

Target End

July 13, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.