TMT CONST is listed as a company organization in Philippine public procurement records on this site, with 172 linked DPWH project(s) totaling about ₱862,374,463.26. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
TMT CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 172
- Total value
- ₱862,374,463.26
- Published flags
- 1
- Region
- Ilocos Norte 1st DEO · Region I
Online presence
Google Maps: TMT Construction Main Office★ 5 (1 reviews)Google Maps, 2026-10-22
5HQ2+2RX, Laoag City, Ilocos Norte
Licensed officers (PCAB)
- Marissa Tagala Tapaoan · Authorized Managing Officer (PCAB license 39686) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for TMT CONST — not an accusation or finding of wrongdoing.
Score: 80.40 / 100 · Projects in sample: 172 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 59.9/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 59.9
- lateCompletedProjects
- 6
- onTimeCompletedProjects
- 121
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 167
- pastTargetOngoingProjects
- 40
- undatedCompletedProjectsExcluded
- 5
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 172
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 172
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.8/100 · Weight: 11%
- projects
- 172
- componentScore
- 99.8
- flagsPerProject
- 0.01
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 172
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 134 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS - BANGUI DISTRICT HOSPITAL, ILOCOS NORTE24A00605 · ₱48,750,438.67 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY LYDIA, MARCOS, ILOCOS NORTE23AB0069 · ₱39,199,999.10 · mapped
- SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY IMELDA, MARCOS, ILOCOS NORTE25AB0087 · ₱29,096,178.91 · mapped
- 'REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER (BOTH BANK), BRGY QUILING SUR, BATAC, ILOCOS NORTE24AB0155 · ₱28,660,514.97 · mapped
- SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BRGY. IMELDA, MARCOS, ILOCOS NORTE25AB0170 · ₱28,074,381.39 · mapped
- SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES ,CONCRETING OF ROAD, BRGY. PACIFICO-CACAFEAN, BRGY, CACAFEAN, MARCOS ILOCOS NORTE25AB0100 · ₱21,380,578.98 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING SANGGUNIANG BAYAN HALL, MARCOS, ILOCOS NORTE23AB0119 · ₱19,799,976.93 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL AND LEGISLATIVE BUILDING), BARANGAY MUMULAAN, PAOAY, ILOCOS NORTE24AB0069 · ₱19,208,000.00 · mapped
- CONCRETING OF BRGY. TAGUIPORO FMR, BRGY. TAGUIPORO, BANGUI, ILOCOS NORTE24AA0429 · ₱19,124,569.87 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (EVACUATION CENTER), BACARRA, ILOCOS NORTE23AA0351 · ₱17,639,949.36 · mapped
- CONCRETING OF SITIO BALAY CALI FMR IN FRANCISCO, DINGRAS, ILOCOS NORTE22AB0160 · ₱14,925,000.00 · mapped
- Construction of Slope Protection along Abang Bridge (Downstream Side Left Bank), Barangay Lanao, Bangui, Ilocos Norte23AA0062 · ₱14,849,740.15 · mapped
- SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONCRETING OF ROAD, SITIO PASUI, BRGY. CAYUBOG, PAOAY, ILOCOS NORTE25AB0080 · ₱14,552,548.66 · mapped
- SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES , CONSTRUCTION OF ROAD, SITIO PASUI, BARANGAY CAYUBOG, PAOAY, ILOCOS NORTE25AB0096 · ₱14,255,148.55 · mapped
- SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF SLOPE PROTECTION ALONG ABANG BRIDGE (DOWNSTREAM SIDE LEFT BANK), BARANGAY LANAO, BANGUI, ILOCOS NORTE, PHASE II23AA0296 · ₱14,110,896.93 · mapped
- CONST. OF 3 STOREY 3 UNIT REG WORKSHOP, FLORENTINO CAMAQUIN INTEGRATED SCHOOL, VINTAR IN17AA0531 · ₱13,668,705.68
- CONCRETING OF BRGY. MUMULAAN FMR, BRGY. MUMULAAN, PAOAY, ILOCOS NORTE23AB0157 · ₱12,478,018.83 · mapped
- CONCRETING OF BRGY. SIDEG FMR, BRGY. SIDEG, PAOAY, ILOCOS NORTE23AB0163 · ₱12,476,187.35 · mapped
- CONCRETING OF SITIO POLONDAY TO SITIO CAPURICTAN, BRGY. ESCODA FMR, BRGY. ESCODA, MARCOS, ILOCOS NORTE23AB0178 · ₱12,475,424.80 · mapped
- CONCRETING OF BRGY. CARUSIKIS FMR, BRGY. CARUSIKIS, PASUQUIN, ILOCOS NORTE23AA0430 · ₱12,437,345.16 · mapped
- CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING IN PLARIDEL ELEMENTARY SCHOOL, BARANGAY 28, LAOAG CITY, ILOCOS NORTE24AA0467 · ₱11,701,235.18 · mapped
- SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, MABUTI-CAPARIAAN, MARCOS, ILOCOS NORTE25AB0088 · ₱11,359,198.16 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI - PURPOSE BUILDING SAGAT ELEMENTARY SCHOOL, BARANGAY SAGAT, STA. CRUZ, ILOCOS SUR24A00505 · ₱9,895,132.38 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO MADONGAN DAM, MARCOS, ILOCOS NORTE24AB0002 · ₱9,800,000.00 · mapped
- CONSTRUCTION OF CACAFEAN ESCODA & PACIFICO ROAD WITH SLOPE PROTECTION BRGY. CACAFEAN, ESCODA AND PACIFICO, MARCOS, ILOCOS NORTE22AB0110 · ₱9,800,000.00 · mapped
- BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS HUB) BARANGAY SAN ILDEFONSO, SAN NICOLAS, ILOCOS NORTE25AB0026 · ₱9,799,762.17 · mapped
- CONSTRUCTION OF SOLAR WATER SYSTEM, PAOAY, ILOCOS NORTE23AB0124 · ₱9,615,990.98 · mapped
- CONSTRUCTION OF SOLAR WATER SYSTEM, MARCOS, ILOCOS NORTE23AB0123 · ₱9,615,990.98 · mapped
- CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ACCESS ROAD LEADING TO MADONGAN DAM, MARCOS, ILOCOS NORTE25AB0007 · ₱9,582,240.72 · mapped
- BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (TOURISM CENTER), BARANGAY SUBA, PAOAY, ILOCOS NORTE25AB0128 · ₱9,561,804.85 · mapped
- SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD INCLUDING DRAINAGE STRUCTURE AND CANAL LINING AROUND SAN NICOLAS PUBLIC MARKET, SAN NICOLAS, ILOCOS NORTE25AB0084 · ₱9,504,551.15 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD STRUCTURE ALONG PADSAN RIVER TRIBUTARY, CURA RIVER, BARANGAY BARBAQUESO, CARASI, ILOCOS NORTE25AA0049 · ₱9,403,003.28 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PADSAN RIVER TRIBUTARY, CURA RIVER, SITIO 1, BARANGAY BARBAQUESO, CARASI, ILOCOS NORTE25AA0050 · ₱9,380,190.18 · mapped
- CONSTRUCTION OF MULTI PURPOSE BUILDING, (COVERED COURT) BARANGAY BUCAROT, ADAMS, ILOCOS NORTE24AA0265 · ₱9,277,568.80 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (DSWD BUILDINGS), BARANGAY CAMANGAAN, LAOAG CITY, ILOCOS NORTE23AA0313 · ₱8,819,982.57 · mapped
- NETWORK DEVELOPMENT PROGRAM - OFF CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - ILOCOS NORTE - APAYAO RD - K0490+(-559) - K0490+00025AA0626 · ₱6,129,830.62 · mapped
- CONSTRUCTION OF 1 STOREY 2 CLASSROOM SCHOOL BUILDING IN SUYO ELEMENTARY SCHOOL, BARANGAY BARUYEN, BANGUI, ILOCOS NORTE24AA0416 · ₱5,831,940.63 · mapped
- CONST./IMPROV. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - BANBAN-PAYAC ROAD LEADING TO USUKAN ECOTOURISM AND ADVENTURE PARK, NANGLIMASAN FALLS AND GUANO CAVE, BRGY. BANBAN, BANGUI, ILOCOS NORTE24AA0143 · ₱5,674,742.87 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES, LAOAG CITY, ILOCOS NORTE20AA0269 · ₱5,424,424.68 · mapped
- CONSTRUCTION OF THE MULTI-PURPOSE FACILITY (MUNICIPAL PUBLIC MARKET), MARCOS, ILOCOS NORTE23AB0126 · ₱4,949,990.03 · mapped
- Construction of Drainage Canal, Macario Castro. St., Bacarra, Ilocos Norte23AA0061 · ₱4,949,131.55 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN POBLACION BRGY. LYDIA, MARCOS, ILOCOS NORTE24AB0073 · ₱4,948,780.60 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY 59-B DIBUA NORTH, LAOAG CITY, ILOCOS NORTE24AA0268 · ₱4,948,761.37 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE FACILITY, PAOAY NATIONAL HIGH SCHOOL, PAOAY, ILOCOS NORTE24AB0065 · ₱4,946,014.36 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MABUTI, MARCOS, ILOCOS NORTE23AB0059 · ₱4,900,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ELIZABETH, MARCOS, ILOCOS NORTE23AB0056 · ₱4,900,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY IMELDA, MARCOS, ILOCOS NORTE23AB0057 · ₱4,900,000.00 · mapped
- SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY 61 CATABAN, LAOAG CITY, ILOCOS NORTE24AA0168 · ₱4,899,943.29 · mapped
- Construction of Slope Protection at Sitio Sadiri, Barangay 35 Pipias, Bacarra, Ilocos Norte23AA0290 · ₱4,899,902.53 · mapped
- Construction of Lined Canal, Barangay 27 Nuestra Senora de Soledad, Laoag City, Ilocos Norte24AA0208 · ₱4,899,791.75 · mapped
Equipment & capacity
PCAB license
- License no.
- 39686
- Category
- C · Small B
- Minimum net worth for this category
- ₱6,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱30M
- License valid until
- Nov 13, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 39686); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
9 evaluations listed across 4 GPPB CPES releases; average final rating 92.1% over 5 rated projects; 9 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jan 19, 2026 | NIA | ₱5,344,856.00 | Completed | 89.9% | 89.9% | 41st, p. 19 |
| Jul 23, 2025 | DPWH | ₱21,380,578.00 | On-going | 95.3% | — | 40th, p. 305 |
| May 5, 2025 | DPWH | ₱9,582,241.00 | On-going | 92.6% | — | 40th, p. 304 |
| Dec 2, 2024 | NIA | ₱19,140,813.00 | Completed | 85.4% | 85.4% | 38th, p. 241 |
| May 17, 2024 | DPWH | ₱9,800,000.00 | On-going | 97.9% | — | 38th, p. 241 |
| May 16, 2024 | DPWH | ₱4,899,943.00 | Completed | 99.7% | 99.7% | 38th, p. 241 |
| Mar 20, 2024 | DPWH (JV) | ₱39,199,999.00 | Completed | 99.2% | 93.3% | 37th, p. 88 |
| Mar 12, 2024 | DA | ₱12,437,345.00 | Completed | 96.0% | 92.2% | 38th, p. 241 |
| Dec 5, 2023 | DA | ₱12,437,345.00 | On-going | 89.7% | — | 37th, p. 108 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →