SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF SLOPE PROTECTION ALONG ABANG BRIDGE (DOWNSTREAM SIDE LEFT BANK), BARANGAY LANAO, BANGUI, ILOCOS NORTE, PHASE II
SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF SLOPE PROTECTION ALONG ABANG BRIDGE (DOWNSTREAM SIDE LEFT BANK), BARANGAY LANAO, BANGUI, ILOCOS NORTE, PHASE II is a DPWH-tracked public work in Ilocos Norte 1st DEO, Region I. Reported contract value: ₱14,110,896.93. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: TMT CONST. Figures trace to dpwh.