CONSTRUCTION/ REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG TALAVERA RIVER BRGY. PAG-ASA, TALAVERA, NUEVA ECIJA, STA. 054+290.98 TO STA. 054+429.58
CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG TALAVERA RIVER BRGY. PAG-ASA, TALAVERA, NUEVA ECIJA, STA. 054+290.98 TO STA. 054+429.58 is a DPWH-tracked public work in Nueva Ecija 1st DEO, Region III. Reported contract value: ₱22,134,901.95. Status: Reported complete (DPWH). Contractor on record: AMP 723 CONST CORP FORMERLY: A M P CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost

