Construction of Flood Control Structure, Ala River, Sitio Balanacan (Upstream), Lambayong, Sultan Kudarat
Construction of Flood Control Structure, Ala River, Sitio Balanacan (Upstream), Lambayong, Sultan Kudarat is a DPWH-tracked public work in LAMBAYONG (MARIANO MARCOS) (SULTAN KUDARAT), SULTAN KUDARAT, Region XII. Reported contract value: ₱48,939,622.32. Status: Reported complete (DPWH). Contractor on record: RELY CONST & SUPPLY INC FORMERLY: RELY CONST AND SUPPLY. Figures trace to sumbong.
Total Contract Cost

