CONSTRUCTION OF 2 STY 8 CL SHS IN CARMEN, CARMEN, AGUSAN DEL NORTE 2ND L.D.

CONSTRUCTION OF 2 STY 8 CL SHS IN CARMEN, CARMEN, AGUSAN DEL NORTE 2ND L.D. is a DPWH-tracked public work in Agusan del Norte DEO, Region XIII. Reported contract value: ₱11,582,013.95. Status: Reported complete (DPWH). Contractor on record: RUDHIL CONST. Figures trace to dpwh.

Agusan del Norte DEO, Region XIII

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Region XIII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.75

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXII-16-0013900 · ₱3,172,462 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16NA0034 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,447,752 per classroom= 1.0x the Region XIII median (n=254)

Contract cost ₱11,582,014 ÷ 8 classroom read from the DPWH title (“2 STY 8 CL”; classroom count in title). National percentile: 37. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 2 STY 8 CL SHS IN CARMEN, CARMEN, AGUSAN DEL NORTE 2ND L.D.

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 75%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction / Rehabilitation of Dapa - Osmeña Flood Control Structures, Dapa, Surigao del Norte 1st LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXII-16-0013900

₱3,172,462.00 · FY2016

Released to Regional Office - XII (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

1,028 projects · ₱22.5B total · 0 flags

4. Implementation

Contract Amount

₱11,582,013.95

Progress

Reported complete (DPWH)

Start Date

July 28, 2016

Target End

March 24, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.