Flood Control and Drainage16DD0114

LOCAL INFRASTRUCTURE PROGRAM - REPAIR / MAINTENANCE OF FLOOD CONTROL PROJECT ALONG SAN JUAN - LAIYA ROAD, PUTING BUHANGIN - NAGSAULAY SECTION, SAN JUAN, BATANGAS

LOCAL INFRASTRUCTURE PROGRAM - REPAIR / MAINTENANCE OF FLOOD CONTROL PROJECT ALONG SAN JUAN - LAIYA ROAD, PUTING BUHANGIN - NAGSAULAY SECTION, SAN JUAN, BATANGAS is a DPWH-tracked public work in Batangas 4th DEO, Region IV-A. Reported contract value: ₱18,392,038.88. Status: Reported complete (DPWH). Contractor on record: ALL EML CONST CORP FORMERLY: E M L CONST. Figures trace to dpwh.

Batangas 4th DEO, Region IV-A
Region: Region IV-A

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

GAA FY2016 not yet loaded (source: DBM GAA)

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

66 projects · ₱3.2B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF BY-PASS AND DIVERSION ROADLUCBAN DIVERSION RD, QUEZON

Region IV-A, Region IV-A

2025₱327.6M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROADS, BACOLOR-PORAC ACCESS ROAD (PORAC SECTION)-PACKAGE 2, PROVINCE OF PAMPANGA

Region III, Region III

2023₱162.4M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES; CONSTRUCTION OF ABACAN ROAD DIKE (LEFT SIDE) UPSTREAM OF HENSONVILLE BRIDGE, ANGELES

Pampanga 3rd DEO, Region III

2024₱130.3M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE - PRIMARY ROADS - JOSE ABAD SANTOS AVE (JASA) K0076+(-010)-K0077+920

Pampanga 2nd DEO, Region III

2025₱124.2M
Reported complete (DPWH)
No sat.

FY 2024 DPWH INFRASTRUCTURE PROG.-ORGANIZATIONAL OUTCOME 1:ENSURE SAFE & RELIABLE NATL ROAD SYSTEM-ASSET PRESERVATION PROG.-CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL RDS - PRIMARY RDS-DAANG MAHARLIKA (LZ)-K0088+910-K0090+042

Region IV-A, Region IV-A

2024₱114.1M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES; CONSTRUCTION OF ROAD DIKE WITH SLOPE PROTECTION ALONG ABACAN RIVER AT BARANGAY ANUNA

Pampanga 3rd DEO, Region III

2024₱96.5M
Reported complete (DPWH)
View all 66 projects →

4. Implementation

Contract Amount

₱18,392,038.88

Progress

Reported complete (DPWH)

Start Date

April 10, 2016

Target End

October 6, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.