ALL EML CONST CORP FORMERLY: E M L CONST is listed as a company organization in Philippine public procurement records on this site, with 66 linked DPWH project(s) totaling about ₱3,227,697,930.10. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
ALL EML CONST CORP FORMERLY: E M L CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 66
- Total value
- ₱3,227,697,930.10
- Published flags
- 0
- Region
- Bulacan 1st DEO · Region III
Public Record Grade
A transparent, data-derived summary of reported public records for ALL EML CONST CORP FORMERLY: E M L CONST — not an accusation or finding of wrongdoing.
Score: 87.10 / 100 · Projects in sample: 66 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 80.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 80.7
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 55
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 64
- pastTargetOngoingProjects
- 6
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 66
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 66
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 66
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 66
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 36 of 43 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADLUCBAN DIVERSION RD, QUEZON25D00272 · ₱327,633,398.58 · mapped
- NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROADS, BACOLOR-PORAC ACCESS ROAD (PORAC SECTION)-PACKAGE 2, PROVINCE OF PAMPANGA23C00053 · ₱162,404,967.38 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES; CONSTRUCTION OF ABACAN ROAD DIKE (LEFT SIDE) UPSTREAM OF HENSONVILLE BRIDGE, ANGELES24CI0081 · ₱130,253,503.89 · mapped
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE - PRIMARY ROADS - JOSE ABAD SANTOS AVE (JASA) K0076+(-010)-K0077+92025CH0008 · ₱124,186,121.78 · mapped
- FY 2024 DPWH INFRASTRUCTURE PROG.-ORGANIZATIONAL OUTCOME 1:ENSURE SAFE & RELIABLE NATL ROAD SYSTEM-ASSET PRESERVATION PROG.-CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL RDS - PRIMARY RDS-DAANG MAHARLIKA (LZ)-K0088+910-K0090+04224D00111 · ₱114,083,023.10 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES; CONSTRUCTION OF ROAD DIKE WITH SLOPE PROTECTION ALONG ABACAN RIVER AT BARANGAY ANUNA24CI0082 · ₱96,486,293.83 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES; CONSTRUCTION OF ROAD DIKE WITH SLOPE PROTECTION ALONG ABACAN RIVER AT BARANGAY AMSIC24CI0083 · ₱96,486,274.07 · mapped
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING OF ANGELES-PORAC-FLORIDABLANCA-DINALUPIHAN ROAD K0108+1035-K111+94618CH0050 · ₱95,632,490.69 · mapped
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS- PRIMARY ROADS, EPIFANIO DELOS SANTOS AVENUE (EDSA) (S05142LZ) K0020+(080) -K0017+100, QUEZON CITY19O00004 · ₱89,970,259.42 · mapped
- REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER FLOOD MANAGEMENT PROJECTS, BRGY. NATAPPIAN, SOLANA, CAGAYAN, STA. 0+700 - STA. 0+(-760), STA. 1+100 - STA. 1+24024BD0223 · ₱89,308,525.98 · mapped
- REHABILITATION OF PAVED ROAD-EPIFANIO DELOS SANTOS AVENUE (EDSA) - K0016+059-K0016+654, K0017+314- K0018+409, EDSA, QUEZON CITY18O00003 · ₱87,381,192.85 · mapped
- CONST./REP./REHAB./IMPR'VT. OF VARIOUS INFRASTRUCTURE INCL. LOCAL PROJECTS, ROADS & BRIDGES-LOCAL ROADS, REHAB. OF JOSE ABAD SANTOS AVENUE-NATIONAL HIGHWAY FROM SAN FERNANDO UP TO THE BOUNDARY OF ARAYAT & NUEVA ECIJA, PAMP. 3RD LD, PROV. OF PAMPANGA16C00059 · ₱86,568,386.12
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PRAWN FRY HATCHERIES AND RESORTS AND SURFING AREA, SAN FELIPE,ZAMBALES22CL0054 · ₱67,426,195.03 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING, PHASE II, MEXICO, PAMPANGA25CG0120 · ₱67,217,603.86
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO SEAPORTS LAPAZ PORT, SAN NARCISO, ZAMBALES18CL0096 · ₱65,601,017.57 · mapped
- ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - TERTIARY ROADS - ARAYAT - MAGALANG RD, K0095+000 - K0097+30824CG0206 · ₱65,183,052.08 · mapped
- NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - LUBAO DIVERSION ROAD K0084+(-882) - K0084+083, K0084+112.45 - K0085+238, LUBAO, PAMPANGA18CH0100 · ₱57,200,726.45 · mapped
- NETWORK DEVELOPMENT PROGRAM;ROAD WIDENING,SECONDARY ROADS,CONCEPCION-CAPAS ROAD-KO107+(-178)-KO108+703,MAGALANG, PAMPANGA18CI0070 · ₱56,903,363.98 · mapped
- ROAD WIDENING- SECONDARY ROADS- AMUNGAN- PALAUIG- BANLOG ROAD- K0212+480- K0213+680, K0213+900- K0214+100, IBA, ZAMBALES18CL0048 · ₱52,490,138.53 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BLDNGS/FACILITIES: REHABILITATION OF MAGALANG-AYALA ROAD, MAGALANG, PAMPANG23CI0006 · ₱48,976,858.00 · mapped
- FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SACOBIA RIVER AT MABALACAT CITY, PAMPANGA (PHASE 6)25CI0032 · ₱48,964,801.75 · mapped
- ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROADS-MANILA EAST RD-K0064+400-K0065+882 PILILLA, RIZAL21DO0035 · ₱48,617,181.12 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI-PURPOSE BUILDING, MEXICO, PAMPANGA24CG0119 · ₱47,765,668.77 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS, SECONDARY ROAD, OLONGAPO-BUGALLON-ROAD K0 164+140 - K0164+85118CL0070 · ₱47,549,425.68 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO SEAPORTS, STO. NIÑO BOULEVARD, SAN FELIPE, ZAMBALES18CL0065 · ₱47,058,800.52 · mapped
- OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG ANGELES-PORAC-FLORIDABLANCA-DINALUPIHAN ROAD K017CH0049 · ₱45,262,419.81 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION/IMPROVEMEN17CH0020 · ₱42,412,548.02 · mapped
- COMPLETE CONSTRUCTION OF 4-STOREY 20 CLASSROOM SCHOOL BUILDING, TALIMUNDOK ELEMENTARY SCHOOL, MABALACAT CITY18CI0094 · ₱41,174,231.17 · mapped
- CONCRETING OF BARANGAY ROAD, SAN JOSE MITLA-MITLA PROPER, STA. 0+140-STA. 0597.40, STA. 1+722.40-STA.2+636, STA. 3+105-STA. 3+624.40, STA. 3+853.90-STA.4+920, PORAC, PAMPANGA18CH0069 · ₱40,886,118.94 · mapped
- CONSTRUCTION OF REVETMENT ALONG ANGAT RIVER CANIOGAN SECTION CALUMPIT, BULACAN17CC0080 · ₱40,082,186.80
- PACKAGE 7- A. CONSTRUCTION OF 2 STOREY, 4 CLASSROOM SCHOOL BUILDING AT PANAN ELEMENTARY SCHOOL, BOTOLAN, ZAMBALES; B. CONSTRUCTION OF 2 STOREY, 6 CLASSROOM SCHOOL BUILDING AT BANCAL ELEMENTARY SCHOOL, BOTOLAN, ZAMBALES17CL0160 · ₱37,330,537.11
- CONSTRUCTION OF GROUNDSILLS WITH REINFORCED CONCRETE SLOPE PROTECTION ALONG ABACAN RIVER,DOWNSTREAM OF PANDAN BRIDGE,BRGY PANDAN, ANGELES CITY,PAMPANGA19CI0029 · ₱36,339,352.06 · mapped
- CONST OF 4 STOREY 16 CLASSROOMS AT DUQUIT HIGH SCHOOL, MABALACAT CITY17CI0104 · ₱36,326,985.74
- FLOOD MANAGEMENT PROGRAM;CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS,CONSTRUCTION/REHABILITATION OF DRAINAGE SYSTEM, ANGELES CITY,PAMPANGA18CI0104 · ₱35,439,147.72 · mapped
- CONST. OF STA.-ANA-MAGALANG ROAD (SAN PABLO PORTION) TO MEXICO-MAGALANG ROAD (SAN JUAN MEXICO PORTIO16CG0042 · ₱35,055,642.12
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT ALONG BALITE, CALUMPIT, BULACAN17CC0138 · ₱34,900,316.35
- PACKAGE 3- A. CONSTRUCTION OF 3 STOREY, 6 CLASSROOM SCHOOL BUILDING AT LIPAY- DINGIN ELEMENTARY SCHOOL, IBA, ZAMBALES; B. CONSTRUCTION OF 2 STOREY, 4 CLASSROOM SCHOOL BUILDING AT LITTLE BAGUIO ELEMENTARY SCHOOL, IBA, ZAMBALES17CL0156 · ₱33,408,700.15
- MFO-2 FLOOD MANAGEMENT SERVICES-CONSTRUCTTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-BANK IMPROVEMENT (STEEL SHEET PILE) ESTERO DE SAN MIGUEL MANILA CITY16OE0106 · ₱33,255,018.15 · mapped
- REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER FLOOD MANAGEMENT PROJECTS, BRGY. NATAPPIAN, SOLANA, CAGAYAN STA. 0+000 - STA. 0+08024BD0157 · ₱31,513,415.10 · mapped
- NATL ROAD NETWORK SERVICES NETWORK DEVT, IMPVT/WIDENING OF NATL ROADS,PRIMARY ROADS,OUTSIDE N1, MNR16CI0052 · ₱29,758,989.70
- LOCAL PROGRAM;CONST/REPAIR/REHAB/IMPROVEMENT OF VARIOUS STRUCTURE INCL. LOCAL PROJECTS;LOCAL ROADS AND BRIDGES;LOCAL ROADS;CONCRETING OF ROADS,ANGELES CITY,PAMPANGA18CI0063 · ₱29,626,101.46 · mapped
- CONSTRUCTION OF THREE STOREY NINE CLASSROOM - SAN PASCUAL ELEMENTARY SCHOOL HAGONOY, BULACAN17CC0320 · ₱26,706,059.30
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM; SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONST OF STA ANA-MAGALANG ROAD, PAMPANGA22CI0127 · ₱24,496,283.84 · mapped
- CONSTRUCTION OF TABALING SWIP, STA. CRUZ, ZAMBALES17CL0105 · ₱23,777,007.23
- CONCRETING OF TAPOSO-CACALANAN-MAPAHING-BABANCAL ROAD (NATIONAL ROUTE), BABON ONGOT, BABANCAL/TAPOSO, CANDELARIA, ZAMBALES18CL0073 · ₱23,099,075.70 · mapped
- CONSTRUCTION OF FOUR STOREY EIGHT CLASSROOM - STA. MONICA NATIONAL HIGH SCHOOL HAGONOY, BULACAN17CC0257 · ₱20,733,840.07
- CONSTRUCTION OF SLOPE PROTECTION WORK AT BUCAO DIKE (UPSTREAM), STA. 5+900-STA. 6+235, BOTOLAN, ZAMB17CL0017 · ₱20,493,657.06
- CONSTRUCTION/IMPROVEMENT OF ROADS WITH SLOPE PROTECTION BRGY. SAN JUAN, BALAGTAS - BRGY. TAAL, BOCAUE, BULACAN18CC0216 · ₱20,193,066.50 · mapped
- VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - DRAINAGE/PROTECTION WORKS - CONSTRUCTION OF SLOPE PROTECTION ALONG SANTOL CREEK, MALIGAYA SECTION, FLORIDABLANCA, PAMPANGA20CH0013 · ₱20,164,905.65 · mapped
- CONSTRUCTION OF FOUR STOREY TWELVE CLASSROOM - STA. MONICA NATIONAL HIGH SCHOOL HAGONOY, BULACAN16CC0164 · ₱19,202,978.51
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →