Flood Control and Drainage19CI0029

CONSTRUCTION OF GROUNDSILLS WITH REINFORCED CONCRETE SLOPE PROTECTION ALONG ABACAN RIVER,DOWNSTREAM OF PANDAN BRIDGE,BRGY PANDAN, ANGELES CITY,PAMPANGA

CONSTRUCTION OF GROUNDSILLS WITH REINFORCED CONCRETE SLOPE PROTECTION ALONG ABACAN RIVER,DOWNSTREAM OF PANDAN BRIDGE,BRGY PANDAN, ANGELES CITY,PAMPANGA is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱36,339,352.06. Status: Reported complete (DPWH). Contractor on record: ALL EML CONST CORP FORMERLY: E M L CONST. Figures trace to dpwh.

Pampanga 3rd DEO, Region III
Region: Region III

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-19-0017870

₱1,244,000.00 · FY2019

Released to Davao Region Centers for Health Development (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

66 projects · ₱3.2B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF BY-PASS AND DIVERSION ROADLUCBAN DIVERSION RD, QUEZON

Region IV-A, Region IV-A

2025₱327.6M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROADS, BACOLOR-PORAC ACCESS ROAD (PORAC SECTION)-PACKAGE 2, PROVINCE OF PAMPANGA

Region III, Region III

2023₱162.4M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES; CONSTRUCTION OF ABACAN ROAD DIKE (LEFT SIDE) UPSTREAM OF HENSONVILLE BRIDGE, ANGELES

Pampanga 3rd DEO, Region III

2024₱130.3M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE - PRIMARY ROADS - JOSE ABAD SANTOS AVE (JASA) K0076+(-010)-K0077+920

Pampanga 2nd DEO, Region III

2025₱124.2M
Reported complete (DPWH)
No sat.

FY 2024 DPWH INFRASTRUCTURE PROG.-ORGANIZATIONAL OUTCOME 1:ENSURE SAFE & RELIABLE NATL ROAD SYSTEM-ASSET PRESERVATION PROG.-CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL RDS - PRIMARY RDS-DAANG MAHARLIKA (LZ)-K0088+910-K0090+042

Region IV-A, Region IV-A

2024₱114.1M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES; CONSTRUCTION OF ROAD DIKE WITH SLOPE PROTECTION ALONG ABACAN RIVER AT BARANGAY ANUNA

Pampanga 3rd DEO, Region III

2024₱96.5M
Reported complete (DPWH)
View all 66 projects →

4. Implementation

Contract Amount

₱36,339,352.06

Progress

Reported complete (DPWH)

Start Date

July 5, 2019

Target End

December 31, 2019

5. Audit