FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SACOBIA RIVER AT MABALACAT CITY, PAMPANGA (PHASE 6)
FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SACOBIA RIVER AT MABALACAT CITY, PAMPANGA (PHASE 6) is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱48,964,801.75. Status: Past target date (DPWH On-Going). Contractor on record: ALL EML CONST CORP FORMERLY: E M L CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
