Buildings and Facilities17CL0160

PACKAGE 7- A. CONSTRUCTION OF 2 STOREY, 4 CLASSROOM SCHOOL BUILDING AT PANAN ELEMENTARY SCHOOL, BOTOLAN, ZAMBALES; B. CONSTRUCTION OF 2 STOREY, 6 CLASSROOM SCHOOL BUILDING AT BANCAL ELEMENTARY SCHOOL, BOTOLAN, ZAMBALES

PACKAGE 7- A. CONSTRUCTION OF 2 STOREY, 4 CLASSROOM SCHOOL BUILDING AT PANAN ELEMENTARY SCHOOL, BOTOLAN, ZAMBALES; B. CONSTRUCTION OF 2 STOREY, 6 CLASSROOM SCHOOL BUILDING AT BANCAL ELEMENTARY SCHOOL, BOTOLAN, ZAMBALES is a DPWH-tracked public work in Zambales 1st DEO, Region III. Reported contract value: ₱37,330,537.11. Status: Reported complete (DPWH). Contractor on record: ALL EML CONST CORP FORMERLY: E M L CONST. Figures trace to dpwh.

Zambales 1st DEO, Region III
Region: Region III

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Slope Protection/Flood Control, Lauis River Control, Candelaria, Zambales
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-17-0022649

₱7,844.00 · FY2017

Released to Pablo Lorenzo National High School (Mandug National High School) (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

66 projects · ₱3.2B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF BY-PASS AND DIVERSION ROADLUCBAN DIVERSION RD, QUEZON

Region IV-A, Region IV-A

2025₱327.6M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROADS, BACOLOR-PORAC ACCESS ROAD (PORAC SECTION)-PACKAGE 2, PROVINCE OF PAMPANGA

Region III, Region III

2023₱162.4M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES; CONSTRUCTION OF ABACAN ROAD DIKE (LEFT SIDE) UPSTREAM OF HENSONVILLE BRIDGE, ANGELES

Pampanga 3rd DEO, Region III

2024₱130.3M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE - PRIMARY ROADS - JOSE ABAD SANTOS AVE (JASA) K0076+(-010)-K0077+920

Pampanga 2nd DEO, Region III

2025₱124.2M
Reported complete (DPWH)
No sat.

FY 2024 DPWH INFRASTRUCTURE PROG.-ORGANIZATIONAL OUTCOME 1:ENSURE SAFE & RELIABLE NATL ROAD SYSTEM-ASSET PRESERVATION PROG.-CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL RDS - PRIMARY RDS-DAANG MAHARLIKA (LZ)-K0088+910-K0090+042

Region IV-A, Region IV-A

2024₱114.1M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES; CONSTRUCTION OF ROAD DIKE WITH SLOPE PROTECTION ALONG ABACAN RIVER AT BARANGAY ANUNA

Pampanga 3rd DEO, Region III

2024₱96.5M
Reported complete (DPWH)
View all 66 projects →

4. Implementation

Contract Amount

₱37,330,537.11

Progress

Reported complete (DPWH)

Start Date

January 10, 2018

Target End

June 8, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.