Flood Control and Drainage20OD0202

CONSTRUCTION OF FLOOD CONTROL WALL ALONG MARULAS CREEKS (FROM MCARTHUR HIGHWAY TO TULLAHAN RIVER), BRGY. MARULAS, VALENZUELA CITY

CONSTRUCTION OF FLOOD CONTROL WALL ALONG MARULAS CREEKS (FROM MCARTHUR HIGHWAY TO TULLAHAN RIVER), BRGY. MARULAS, VALENZUELA CITY is a DPWH-tracked public work in Metro Manila 3rd DEO, National Capital Region. Reported contract value: ₱46,750,332.28. Status: Reported complete (DPWH). Contractor on record: LARSEN-DUTCHER CONSTRACTOR CORP FORMERLY:LARSEN-DUTCHER CONSTRACTOR. Figures trace to dpwh.

Metro Manila 3rd DEO, National Capital Region
Region: National Capital Region

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱50,000

    Probable match · score 0.98

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱46,750,332

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-29 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · NCR, Third District

Based on the coordinates published with the DPWH record and NOAH file Metro Manila.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD CONTROL WALL ALONG MARULAS CREEKS (FROM MCARTHUR HIGHWAY TO TULLAHAN RIVER), BRGY. MARULAS, VALENZUELA CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 98%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Wall along Marulas Creeks (from McArthur Highway to Tullahan River), Brgy. Marulas, Valenzuela City
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Metro Manila 3rd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

20OD0202

₱46,750,332.28 · Awardee from PhilGEPS

Award / contract ref: 20OD0202

4. Implementation

Contract Amount

₱46,750,332.28

Progress

Reported complete (DPWH)

Start Date

November 20, 2020

Target End

July 17, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.