Bridges22IB0088

CONSTRUCTION OF NEW BRIDGES, BIGO BR., ALONG ARTECHE - JIPAPAD - LAS NAVAS - RAWIS RD

CONSTRUCTION OF NEW BRIDGES, BIGO BR., ALONG ARTECHE - JIPAPAD - LAS NAVAS - RAWIS RD is a DPWH-tracked public work in Eastern Samar DEO, Region VIII. Reported contract value: ₱96,499,997.72. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: 888 ACY ENT. Figures trace to dpwh.

Eastern Samar DEO, Region VIII
Region: Region VIII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22IB0088 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-06-16 → 2025-06-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF NEW BRIDGES, BIGO BR., ALONG ARTECHE - JIPAPAD - LAS NAVAS - RAWIS RD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control along Brgy. Saurong, Oras, Eastern Samar
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Eastern Samar DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

Not graded

292 projects · ₱9.1B total · 5 flags

4. Implementation

Contract Amount

₱96,499,997.72

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

April 7, 2022

Target End

August 14, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.