Flood Control and Drainage24DK0134

CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BRGY. UNGOS - BRGY. POBLACION 61, REAL, QUEZON

CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BRGY. UNGOS - BRGY. POBLACION 61, REAL, QUEZON is a DPWH-tracked public work in Quezon 1st DEO, Region IV-A. Reported contract value: ₱29,698,841.15. Status: Past target date (DPWH On-Going). Contractor on record: F M PUJEDA BUILDERS AND CONST SUPPLIES. Figures trace to dpwh.

Quezon 1st DEO, Region IV-A
Region: Region IV-A

Satellite images pending: this project is in the imagery queue (completed projects first, then ongoing). Before/after images will appear here when it is processed.

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱30,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24DK0134 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    85% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Quezon

Based on the coordinates published with the DPWH record and NOAH file Quezon.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BRGY. UNGOS - BRGY. POBLACION 61, REAL, QUEZON

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Brgy. Ungos - Brgy. Poblacion 61, Real, Quezon
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Quezon 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

79 projects · ₱387.4M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - MARIKINA-INFANTA RD - K0123 + 165 - K0123 + 190

Quezon 1st DEO, Region IV-A

2023₱24.5M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - FAMY - REAL - INFANTA - DINAHICAN PORT RD - K0115+130 - K0115+180

Quezon 1st DEO, Region IV-A

2024₱17.6M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - FAMY-REAL-INFANTA-DINAHICAN PORT RD - K0100 + 916 - K0101 + 097, K0103+000 - K0103 + 076

Quezon 1st DEO, Region IV-A

2024₱16.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - FAMY-REAL-INFANTA-DINAHICAN PORT RD - K0137 + 660 - K0138 + 391

Quezon 1st DEO, Region IV-A

2022₱14.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ROAD AT BARANGAY MAGSIKAP, GENERAL NAKAR, QUEZON

Quezon 1st DEO, Region IV-A

2020₱9.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BRGY. PALASAN, BURDEOS, QUEZON

Quezon 1st DEO, Region IV-A

2024₱9.9M
Reported complete (DPWH)
View all 79 projects →

4. Implementation

Contract Amount

₱29,698,841.15

Progress

Past target date (DPWH On-Going)

Start Date

July 29, 2024

Target End

March 5, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.