CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG LINUGOS RIVER (DOWNSTREAM, LEFT SIDE), MAGSAYSAY, MISAMIS ORIENTAL
CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG LINUGOS RIVER (DOWNSTREAM, LEFT SIDE), MAGSAYSAY, MISAMIS ORIENTAL is a DPWH-tracked public work in Misamis Oriental 1st DEO, Region X. Reported contract value: ₱113,880,320.77. Status: Past target date (DPWH On-Going). Contractor on record: ROAD EDGE TRADING. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost

