Bridges16KJ0123

CONST & MAINT OF BRIDGES ALONG NATL ROADS (RETROFITTING/STRENGTHENING OF PERMANENT BR)-CLUSTER XI, BASERANG BR(BOO360MN), CLARIN BR I(B01138MN), DIGUAN BR(BOO356MN), DUPOL BR(B00346MN), MIGCANAWAY BR II(BOO373MN), PULOT BR(B00362MN) TUDELA BR(BOO1139MN)

CONST & MAINT OF BRIDGES ALONG NATL ROADS (RETROFITTING/STRENGTHENING OF PERMANENT BR)-CLUSTER XI, BASERANG BR(BOO360MN), CLARIN BR I(B01138MN), DIGUAN BR(BOO356MN), DUPOL BR(B00346MN), MIGCANAWAY BR II(BOO373MN), PULOT BR(B00362MN) TUDELA BR(BOO1139MN) is a DPWH-tracked public work in Misamis Occidental 2nd DEO, Region X. Reported contract value: ₱9,720,888.81. Status: Reported complete (DPWH). Contractor on record: VSP STRUCTURE VENTURES CORP FORMERLY: VIRLO CONST. Figures trace to dpwh.

Misamis Occidental 2nd DEO, Region X
Region: Region X

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱31,457 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-17-0018069 · ₱63,205 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16KJ0123 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-08-30 → 2025-03-12

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST & MAINT OF BRIDGES ALONG NATL ROADS (RETROFITTING/STRENGTHENING OF PERMANENT BR)-CLUSTER XI, BASERANG BR(BOO360MN), CLARIN BR I(B01138MN), DIGUAN BR(BOO356MN), DUPOL BR(B00346MN), MIGCANAWAY BR II(BOO373MN), PULOT BR(B00362MN) TUDELA BR(BOO1139MN)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱31,457,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures at Tagoloan River (Scour/Foot Protection Works of Existing Tagoloan Bridges 1 and 2), incl. ROW, Misamis Oriental
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-17-0018069

₱63,205.00 · FY2017

Released to Davao del Sur District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

138 projects · ₱3.5B total · 4 flags

Other projects by this contractor

No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, PHASE 2, LILOAN, CEBU

Region VII, Region VII

2025₱154.3M
Past target date (DPWH On-Going)
No sat.

OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER (DOWNSTREAM), LILOAN, CEBU

Cebu 5th DEO, Region VII

2025₱144.7M
Past target date (DPWH On-Going)

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, COMPOSTELA, CEBU

Cebu 5th DEO, Region VII

2024₱140.2M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. OF FLOOD MITIGATION RIVERBANK FACILITIES ALONG CANSAGA RIVER, PACKAGE I, GARING, CONSOLACION, CEBU

Cebu 6th DEO, Region VII

2025₱135.0M
Past target date (DPWH On-Going)

Construction of Flood Control Structure along Bagatayam River, Sogod, Cebu

SOGOD (CEBU), CEBU, Region VII

2023₱106.1M
Reported complete (DPWH)
No sat.

CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY JUBAY, LILOAN, CEBU

Cebu 5th DEO, Region VII

2025₱99.0M
Past target date (DPWH On-Going)
View all 138 projects →

4. Implementation

Contract Amount

₱9,720,888.81

Progress

Reported complete (DPWH)

Start Date

April 24, 2017

Target End

June 24, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.