CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL ALONG STO. NIÑO RIVER, DOWNSTREAM, CABANGAN, ZAMBALE
CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL ALONG STO. NIÑO RIVER, DOWNSTREAM, CABANGAN, ZAMBALE is a DPWH-tracked public work in Zambales 1st DEO, Region III. Reported contract value: ₱28,379,040.69. Status: Reported complete (DPWH). Contractor on record: STO CRISTO CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
