Buildings and Facilities17JB0043

CONSTRUCTION OF ONE (1) STOREY THREE (3) CLASSROOM SCHOOL BUILDING AT MANAWAN E/S, JOSE DALMAN, ZAMBOANGA DEL NORTE.

CONSTRUCTION OF ONE (1) STOREY THREE (3) CLASSROOM SCHOOL BUILDING AT MANAWAN E/S, JOSE DALMAN, ZAMBOANGA DEL NORTE. is a DPWH-tracked public work in Zamboanga del Norte 2nd DEO, Region IX. Reported contract value: ₱3,752,110.08. Status: Reported complete (DPWH). Contractor on record: WYT CONST AND DEV'T CORP FOR WINLEY TAN CONST. Figures trace to dpwh.

Zamboanga del Norte 2nd DEO, Region IX
Region: Region IX

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-17-0005678 · ₱72,267 · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱3,752,110 · WYT CONSTRUCTION AND DEV'T. .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-07-31 → 2025-04-30

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,250,703 per classroom= 0.9x the Region IX median (n=269)

Contract cost ₱3,752,110 ÷ 3 classroom read from the DPWH title (“THREE (3) CLASSROOM”; classroom count in title). National percentile: 14. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ONE (1) STOREY THREE (3) CLASSROOM SCHOOL BUILDING AT MANAWAN E/S, JOSE DALMAN, ZAMBOANGA DEL NORTE.

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Lawis, Sindangan, Zamboanga del Norte
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-17-0005678

₱72,267.00 · FY2017

Released to Division of Eastern Samar (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

17JB0043

₱3,752,110.08 · WYT CONSTRUCTION AND DEV'T. .

Award / contract ref: 17JB0043

4. Implementation

Contract Amount

₱3,752,110.08

Progress

Reported complete (DPWH)

Start Date

February 6, 2018

Target End

May 11, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.