CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF LIBERTAD RIVER CONTROL, STA. 0 + 000 - STA. 0 + 266.00 (R/S), STA. 0 + 180 - STA. 0 + 240 (L/S), LIBERTAD, ODIONGAN, ROMBLON
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF LIBERTAD RIVER CONTROL, STA. 0 + 000 - STA. 0 + 266.00 (R/S), STA. 0 + 180 - STA. 0 + 240 (L/S), LIBERTAD, ODIONGAN, ROMBLON is a DPWH-tracked public work in Romblon DEO, Region IV-B. Reported contract value: ₱37,617,459.53. Status: Reported complete (DPWH). Contractor on record: E R DELA CRUZ CONST. Figures trace to dpwh.
Total Contract Cost

