Flood Control and Drainage17DO0019

LOCALLY-FUNDED-PROJECTS-LOCAL INFRASTRUCTURE PROGRAM (LIP)-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UPPER MARIKINA RIVER, BARANGAY SAN JOSE TO BARANGAY BALITE, RODRIGUEZ RIZAL 2ND LD

LOCALLY-FUNDED-PROJECTS-LOCAL INFRASTRUCTURE PROGRAM (LIP)-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UPPER MARIKINA RIVER, BARANGAY SAN JOSE TO BARANGAY BALITE, RODRIGUEZ RIZAL 2ND LD is a DPWH-tracked public work in Rizal 2nd DEO, Region IV-A. Reported contract value: ₱38,155,590.07. Status: Reported complete (DPWH). Contractor on record: NEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST. Figures trace to dpwh.

Rizal 2nd DEO, Region IV-A
Region: Region IV-A

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Upper Marikina River, Barangay San Jose to Barangay Balite, Rodriguez, Rizal
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-17-0006150

₱67,088.00 · FY2017

Released to Visayas State University (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

352 projects · ₱28.1B total · 0 flags

4. Implementation

Contract Amount

₱38,155,590.07

Progress

Reported complete (DPWH)

Start Date

March 13, 2017

Target End

October 28, 2017

5. Audit