Roads25BJ0006

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - PAPAYA-MALABING-WANGAL-BINUGAWAN-TADJI-RUNRUNO RD - K0294 + 993 - K0295 + 257, KASIBU, N

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - PAPAYA-MALABING-WANGAL-BINUGAWAN-TADJI-RUNRUNO RD - K0294 + 993 - K0295 + 257, KASIBU, N is a DPWH-tracked public work in Nueva Vizcaya 2nd DEO, Region II. Reported contract value: ₱9,926,177.04. Status: Reported complete (DPWH). Contractor on record: FOURKIDS CONST. Figures trace to dpwh.

Nueva Vizcaya 2nd DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25BJ0006 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-08-07 → 2023-08-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (rehabilitation / reconstruction)

₱37,599,155 per km= 1.4x the Region II median (n=97)

Contract cost ₱9,926,177 ÷ 0.264 km read from the DPWH title (“K0294 + 993 - K0295 + 257”; K-post / station range length). National percentile: 75. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -  REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - PAPAYA-MALABING-WANGAL-BINUGAWAN-TADJI-RUNRUNO RD - K0294 + 993 - K0295 + 257, KASIBU, N

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control at Barangay Sta. Clara, Sta. 0 + 000 - Sta. 0 + 500, Upper Sta. Clara CIS, Barangay Sta. Clara, Aritao, Nueva Vizcaya
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Nueva Vizcaya 2nd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

Not graded

11 projects · ₱91.8M total · 0 flags

4. Implementation

Contract Amount

₱9,926,177.04

Progress

Reported complete (DPWH)

Start Date

February 24, 2025

Target End

May 28, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.