CONSTRUCTION OF RIVER CONTROL STRUCTURE, BULWANG RIVER, DOWNSTREAM (B/S) PHASE 2, ODIONGAN, ROMBLON
CONSTRUCTION OF RIVER CONTROL STRUCTURE, BULWANG RIVER, DOWNSTREAM (B/S) PHASE 2, ODIONGAN, ROMBLON is a DPWH-tracked public work in Romblon DEO, Region IV-B. Reported contract value: ₱132,397,315.38. Status: Past target date (DPWH On-Going). Contractor on record: SUNWEST INC FORMERLY: SUNWEST CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
