CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINANGE SYSTEMS - CONSTRUCTION OF BOX CULVERT AT POBLACION, CATIGBIAN ALONG JCT. (TNR) CBCMR K0035+887, CATIGBIAN, BOHOL
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINANGE SYSTEMS - CONSTRUCTION OF BOX CULVERT AT POBLACION, CATIGBIAN ALONG JCT. (TNR) CBCMR K0035+887, CATIGBIAN, BOHOL is a DPWH-tracked public work in Bohol 1st DEO, Region VII. Reported contract value: ₱4,777,469.04. Status: Reported complete (DPWH). Contractor on record: AL CHRIS CONST. Figures trace to dpwh.
Total Contract Cost
