Roads16A00048

IMPROVEMENT/CONCRETING OF JCT. ILOCOS NORTE-ABRA ROAD LEADING TO TUBEG VIEWDECK, IMELDA PARK, HERCULES MINE ACCESS TO MT. SICAPO CAMP SITE, NUEVA ERA, ILOCOS NORTE (STO. NIÑO SECTION)

IMPROVEMENT/CONCRETING OF JCT. ILOCOS NORTE-ABRA ROAD LEADING TO TUBEG VIEWDECK, IMELDA PARK, HERCULES MINE ACCESS TO MT. SICAPO CAMP SITE, NUEVA ERA, ILOCOS NORTE (STO. NIÑO SECTION) is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱0.00. Status: Past target date (DPWH On-Going). Contractor on record: TOKWING CONST CORP FOR TOKWING CONSTRUC. Figures trace to dpwh.

Region I, Region I
Region: Region I

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2016 GAA. DBM GAA FY2016

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

66 projects · ₱11.2B total · 0 flags

Other projects by this contractor

CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) ANDDRAINAGE SYSTEMS ALONG THE FOLLOWING RIVERS;A.) CADCADIR RIVER, BRGY. BACSAY CATARAOAN SUR, CLAVERIA, CAGAYANB.) CADCADIR RIVER, BRGYS. UNION AND CADCADIR, CLAVERIA, CAGAYANC.) CABICUNGAN RI

Flood Control Management Cluster, Central Office

2023₱1.4B
Reported complete (100% progress, DPWH status On-Going)

CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT IGUIG, CAGAYAN AND AGGUNETAN, LASAM, CAGAYAN

Flood Control Management Cluster, Central Office

2019₱945.5M
Reported complete (100% progress, DPWH status On-Going)
No sat.

REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT

Flood Control Management Cluster, Central Office

2017₱862.9M
Reported complete (DPWH)

REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT

Flood Control Management Cluster, Central Office

2017₱862.0M
Reported complete (DPWH)

PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 6 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 17+450 TO STA. 18+130, LEFT AND RIGHT BANKS, MARIKINA CITY

Flood Control Management Cluster, Central Office

2017₱689.3M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTE

Flood Control Management Cluster, Central Office

2019₱533.8M
Past target date (DPWH On-Going)
View all 66 projects →

4. Implementation

Contract Amount

₱0.00

Progress

Past target date (DPWH On-Going)

Start Date

March 7, 2016

Target End

November 30, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.