CONSTRUCTION OF REVETMENT WALL/ RIVER CONTROL STRUCTURE ALONG TIGUM RIVER, CABATUAN, ILOILO (SECTION 3)
CONSTRUCTION OF REVETMENT WALL/ RIVER CONTROL STRUCTURE ALONG TIGUM RIVER, CABATUAN, ILOILO (SECTION 3) is a DPWH-tracked public work in Iloilo 2nd DEO, Region VI. Reported contract value: ₱119,999,999.99. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: IBC INTERNATIONAL BUILDERS CORP. Figures trace to dpwh.
Total Contract Cost
