CONSTRUCTION OF SLOPE AND BANKS PROTECTION WORKS ALONG BACOOR RIVER, CITY OF BACOOR, CAVITE (PHASE 1)
CONSTRUCTION OF SLOPE AND BANKS PROTECTION WORKS ALONG BACOOR RIVER, CITY OF BACOOR, CAVITE (PHASE 1) is a DPWH-tracked public work in Cavite 3rd DEO, Region IV-A. Reported contract value: ₱98,002,698.46. Status: Past target date (DPWH On-Going). Contractor on record: GRAIA CONST CORP. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost