Flood Control and Drainage24DQ0045

CONSTRUCTION OF SLOPE PROTECTION ALONG ZAPOTE RIVER, PHASE II, BRGY. MOLINO IV, BACOOR CITY, CAVITE

CONSTRUCTION OF SLOPE PROTECTION ALONG ZAPOTE RIVER, PHASE II, BRGY. MOLINO IV, BACOOR CITY, CAVITE is a DPWH-tracked public work in Cavite 3rd DEO, Region IV-A. Reported contract value: ₱144,713,624.34. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: GRAIA CONST CORP 30826. Figures trace to dpwh.

Cavite 3rd DEO, Region IV-A
Region: Region IV-A

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱8,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure and Other Improvements, Brgy. Molino 4, Zapote River, Bacoor, Cavite
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Cavite 3rd DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 30826

46 projects · ₱3.0B total · 0 flags

Other projects by this contractor

CONSTRUCTION OF REVETMENT ALONG BACOOR RIVER, BRGY. PANAPAAN IV, BACOOR CITY, CAVITE

Cavite 3rd DEO, Region IV-A

2024₱144.7M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT ALONG BACOOR RIVER, PHASE 1, BARANGAY MABOLO II, BACOOR CITY, CAVITE

Cavite 3rd DEO, Region IV-A

2025₱143.3M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF SLOPE AND BANKS PROTECTION WORKS ALONG BACOOR RIVER, CITY OF BACOOR, CAVITE (PHASE 1)

Cavite 3rd DEO, Region IV-A

2025₱98.0M
Past target date (DPWH On-Going)

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS, BACOOR RIVER, BRGY.

Cavite 3rd DEO, Region IV-A

2021₱96.5M
Reported complete (DPWH)

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION/ REVETMENT/ RIPRAPPING AND OTHER IMP

Region IV-A, Region IV-A

2019₱96.5M
Reported complete (DPWH)

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION/ REVETMENT/ RIPRAPPING AND OTHER IMP

Region IV-A, Region IV-A

2019₱96.5M
Reported complete (DPWH)
View all 46 projects →

4. Implementation

Contract Amount

₱144,713,624.34

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

May 17, 2024

Target End

July 21, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.