FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURE/ FACILITIES - LOCAL INFRASTRUCTURE PROGRAM-FLOOD MITIGATION OF THE APAGONAN RIVER AND ITS CONFLUENCES ALONG CAGAYAN RIVER (PHASE 4), APARRI, CAGAYAN
FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURE/FACILITIES - LOCAL INFRASTRUCTURE PROGRAM-FLOOD MITIGATION OF THE APAGONAN RIVER AND ITS CONFLUENCES ALONG CAGAYAN RIVER (PHASE 4), APARRI, CAGAYAN is a DPWH-tracked public work in Cagayan 1st DEO, Region II. Reported contract value: ₱33,955,344.79. Status: Reported complete (DPWH). Contractor on record: PERRC INC FORMERLY: P E R R C CONST. Figures trace to dpwh.
Total Contract Cost
