Construction of Panacan River Flood Control Structure, Narra, Palawan
Construction of Panacan River Flood Control Structure, Narra, Palawan is a DPWH-tracked public work in NARRA (PALAWAN), PALAWAN, Region IV-B. Reported contract value: ₱53,063,470.45. Status: Reported complete (DPWH). Contractor on record: C T LEONCIO CONST & TRADING. Figures trace to sumbong.
Total Contract Cost

