CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY POBLACION EAST, SAN ILDEFONSO, ILOCOS SUR
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY POBLACION EAST, SAN ILDEFONSO, ILOCOS SUR is a DPWH-tracked public work in Ilocos Sur 1st DEO, Region I. Reported contract value: ₱20,172,368.40. Status: Past target date (DPWH On-Going). Contractor on record: 739 BUILDERS. Figures trace to dpwh.
Total Contract Cost

