CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (BUGA SECTION), PHASE VI, SAN MIGUEL, BULACAN
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (BUGA SECTION), PHASE VI, SAN MIGUEL, BULACAN is a DPWH-tracked public work in Bulacan 2nd DEO, Region III. Reported contract value: ₱18,619,554.21. Status: Reported complete (DPWH). Contractor on record: 729 CONST INC FORMERLY 722 CONST INC. Figures trace to dpwh.
Total Contract Cost



