Construction of Flood Control Structure along San Miguel River at Marugay-rugay Bridge 2, Phase 2, Barangay Garlang, San Ildefonso, Bulacan
Construction of Flood Control Structure along San Miguel River at Marugay-rugay Bridge 2, Phase 2, Barangay Garlang, San Ildefonso, Bulacan is a DPWH-tracked public work in SAN ILDEFONSO (BULACAN), BULACAN, Region III. Reported contract value: ₱96,499,019.62. Status: Reported complete (DPWH). Contractor on record: 729 CONST INC FORMERLY 722 CONST INC. Figures trace to sumbong.
Total Contract Cost


