Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: Bulacan 3rd District Engineering Office awarded 26 of 26 recorded flood-control contracts (100.0%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (29.6 percentage points higher; binomial p = 1.1e-04), across 16 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This may be due to consistently competitive bidding or standard pricing practices in the district.

Public record entityData not yet available
Location—
AmountData not yet available sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Bulacan 3rd District Engineering Office: contracts

26 of 26 contracts (100%) at ≥99.5% of ABC · peer baseline 70.4% · gap +29.6 pts · binomial p = 1.1e-4. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).

ContractTitleContractor% of ABCSource
24C00526Construction of Revetment along Maguinao Creek, Barangay Maguinao, San Rafael, BulacanCALCON ENGINEERING100.01%DPWH
24C00496Construction of Flood Control Structure along Malangaan River (Upstream), Barangay Camachile, Doña Remedios Trinidad, BulacanFIVE TRAVELLERS CONST INC100.00%DPWH
24C00086Construction of Flood Control Structure along Maasim River (Package VI), Barangay Basuit, San Ildefonso, BulacanADSL CONST & TRADING100.00%DPWH
24C00474Construction of Flood Mitigation Structure along Madlum River (Phase 3), Barangay Masalipit, San Miguel BulacanTOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC100.00%DPWH
24C00517Construction of Flood Mitigation Structure including Road Dike, Malangaan Section (Downstream), Doña Remedios Trinidad, BulacanTOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC100.00%DPWH
23C00188Construction of Flood Control Structure along Bulo River, Sta. 10 + 200 - Sta. 10 + 600, San Miguel, BulacanC T LEONCIO CONST & TRADING / ALLEYWAY CONST100.00%DPWH
23C00189Construction of Flood Control Structure along Bulo River, Sta. 10 + 600 - Sta. 11 + 000, San Miguel, BulacanALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP100.00%DPWH
24C00516Construction of Flood Mitigation Structure including Road Dike, Malangaan Section (Upstream), Doña Remedios Trinidad, BulacanTOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC100.00%DPWH
23C00190Construction of Flood Control Structure along San Miguel River, Sta. 12+430 - Sta. 12+630, San Miguel, BulacanSELPHAR CONST / N B AVILA CONST100.00%DPWH
23C00194Construction of Flood Control Structure, Barangay Maguinao (BSU Section) San Rafael, Bulacan Phase IIEIRISH BUILDERS & SUPPLY INC100.00%DPWH
24C00471Construction of Flood Control Structure along San Miguel River at Marugay-rugay Bridge 2, Phase 2, Barangay Garlang, San Ildefonso, Bulacan729 CONST INC FORMERLY 722 CONST INC100.00%DPWH
24C00512Construction of Flood Mitigation Structure along Madlum River FSRR, Brgy. Tartaro, San Miguel, Bulacan (Phase 1)TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC100.00%DPWH
24C00521Construction of Flood Control Structure along Maasim River, Upig Section, Brgy. Upig, San Ildefonso, BulacanTOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC100.00%DPWH
23C00197Construction of Flood Control Structure at Galas Maasim Creek along Bypass road Phase II, Maasim, San Rafael, BulacanEIRISH BUILDERS & SUPPLY INC100.00%DPWH
23C00229Construction of Flood Control Structures along San Miguel River, Sta. 11 + 510 to Sta. 11 + 810, San Miguel, BulacanGLOBALCRETE BUILDERS INC100.00%DPWH
23C00227Construction of Flood Control Structures Along San Miguel River, Sta. 10 + 910 to Sta. 11 + 210, San Miguel BulacanMRRM TRADING & CONST100.00%DPWH
23C00191Construction of Flood Control Structure Mag-asawang Sapa Creek, San Ildefonso, Bulacan Phase 2M3 KONSTRACT CORP FORMERLY:MARGARITA CONST100.00%DPWH
23C00198Construction of Flood Control Structure along Mag-Asawang Sapa Creek Phase 3, San lldefonso, BulacanM3 KONSTRACT CORP FORMERLY:MARGARITA CONST100.00%DPWH
23C00233Construction of Flood Control Structure along Maasim River, Sta. 8+400 - Sta. 8+705, Brgy. Upig, San Ildefonso, BulacanGREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC100.00%DPWH
23C00248Construction of Flood Control Structures along San Miguel River, Sta. 00+550-Sta. 00+912 (Downstream), Brgy. Batasan Bata, San Miguel, BulacanLE BRON CONST / OLYMPUS MINING AND BUILDERS GROUP PHILS CORP FORMERLY: OLYMPUS BUILDERS AND MINING CORP100.00%DPWH
23C00196Construction of Flood Control Structure at Galas Maasim Creek along Bypass road Phase I, Maasim, San Rafael, BulacanEIRISH BUILDERS & SUPPLY INC100.00%DPWH
23C00247Construction of Flood Control Structures along San Miguel River, Sta. 00+210-Sta. 00+550 (Upstream), Brgy. Batasan Bata, San Miguel, BulacanLE BRON CONST / OLYMPUS MINING AND BUILDERS GROUP PHILS CORP FORMERLY: OLYMPUS BUILDERS AND MINING CORP100.00%DPWH
24C00494Construction of Flood Control Structure along Balaong River (Purok 1 Section, Upstream), Barangay Tartaro, San Miguel, BulacanC & F CONST & DEVELOPMENT CORP100.00%DPWH
23C00228Construction of Flood Control Structures along San Miguel River, Sta. 11 + 210 to Sta. 11 + 510, San Miguel, BulacanFLORDES CONST & TRADING CORP FORMERLY FLO100.00%DPWH
23C00328Construction of Flood Control Structure Along Maasim River, Bgy Maasim, San Rafael, BulacanEIRISH BUILDERS & SUPPLY INC100.00%DPWH
23C00187Construction of Flood Control Structure along Angat River, San Rafael, BulacanGLOBALCRETE BUILDERS INC99.99%DPWH

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Completion schedule is shown for project and contractor flags only.

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Implementing office awards near-ABC contracts far more often than the flood-control baseline

{
  "office": "Bulacan 3rd District Engineering Office",
  "nearAbc": 26,
  "trigger": "office_pattern_aggregate",
  "officeId": "68e75fe4-48cb-5d80-a0e2-faabd693a4c6",
  "threshold": 0.995,
  "binomialTailP": 0.00010889785845247376,
  "nearAbcRatePct": 100,
  "totalContracts": 26,
  "baselineRatePct": 70.4,
  "excessPctPoints": 29.6,
  "expectedNearAbc": 18.3,
  "baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}

Possible Innocent Explanations

  • This may be due to consistently competitive bidding or standard pricing practices in the district.