Construction of Flood Mitigation Structure along Madlum River (Phase 3), Barangay Masalipit, San Miguel Bulacan
Construction of Flood Mitigation Structure along Madlum River (Phase 3), Barangay Masalipit, San Miguel Bulacan is a DPWH-tracked public work in SAN MIGUEL (BULACAN), BULACAN, Region III. Reported contract value: ₱96,499,350.30. Status: Reported complete (DPWH). Contractor on record: TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC. Figures trace to sumbong.
Total Contract Cost






