Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24C00474 was awarded at 100.00% of its ABC. Across its 15 recorded contracts, TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC was awarded at ≥99.5% of ABC 15 times (100.0%), versus 70.4% for flood-control contracts overall. It is possible that the bids were calculated to maximize the allowed budget without exceeding the legal limit.

Public record entityConstruction of Flood Mitigation Structure along Madlum River (Phase 3), Barangay Masalipit, San Miguel Bulacan
LocationSAN MIGUEL (BULACAN), BULACAN, Region IIIContract 24C00474
Amount₱96,499,350.30100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Mitigation Structure along Madlum River (Phase 3), Barangay Masalipit, San Miguel Bulacan24C00474Flood control100%June 9, 2025January 13, 2025—completedsumbong source

Start: July 15, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Bulacan 3rd District Engineering Office",
  "ratio": 1.0000014954527192,
  "abcPhp": 96499205.99,
  "threshold": 0.995,
  "contractId": "24C00474",
  "contractor": "TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC",
  "contractCostPhp": 96499350.3
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate