GAA 2025 DEPED BEFF25BI0101

BASIC EDUACATUIONAL FACILITIES FUNDCONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOM: CONSTRUCTION OF SCHOOL BUILDING, STO. DOMINGO INTEGRATED SCHOOL, BRGY. STO. DOMINGO

BASIC EDUACATUIONAL FACILITIES FUNDCONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOM: CONSTRUCTION OF SCHOOL BUILDING, STO. DOMINGO INTEGRATED SCHOOL, BRGY. STO. DOMINGO is a DPWH-tracked public work in Nueva Vizcaya DEO, Region II. Reported contract value: ₱9,640,784.82. Status: Past target date (DPWH On-Going). Contractor on record: JMRL DESIGN AND CONST. Figures trace to dpwh.

Nueva Vizcaya DEO, Region II
Region: Region II

Satellite images pending: this project is in the imagery queue (completed projects first, then ongoing). Before/after images will appear here when it is processed.

Follow the peso

2 of 5 steps linked from public records. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱40,000

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    Not yet linked

  3. 3. PhilGEPS award

    Not yet linked

  4. 4. DPWH progress + satellite

    67% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH source ↗
  5. 5. COA audit finding

    Not yet linked

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BASIC EDUACATUIONAL FACILITIES FUNDCONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOM: CONSTRUCTION OF SCHOOL BUILDING, STO. DOMINGO INTEGRATED SCHOOL, BRGY. STO. DOMINGO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Along Magat River, Sitio Kinacao, Brgy. Baretbet, Bagabag, Nueva Vizcaya
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Nueva Vizcaya DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

1 projects · ₱9.6M total · 0 flags

4. Implementation

Contract Amount

₱9,640,784.82

Progress

Past target date (DPWH On-Going)

Start Date

June 11, 2025

Target End

January 6, 2026

5. Audit