CONSTRUCTION OF SPILLWAY/ OVERFLOW BRIDGE (KM.8+600) ALONG SAN ISIDRO - LOPE DE VEGA ROAD, SAN ISIDRO, NORTHERN SAMAR
CONSTRUCTION OF SPILLWAY/OVERFLOW BRIDGE (KM.8+600) ALONG SAN ISIDRO - LOPE DE VEGA ROAD, SAN ISIDRO, NORTHERN SAMAR is a DPWH-tracked public work in Northern Samar 1st DEO, Region VIII. Reported contract value: ₱9,149,192.98. Status: Reported complete (DPWH). Contractor on record: JUPA CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
