JUPA CONST is listed as a company organization in Philippine public procurement records on this site, with 117 linked DPWH project(s) totaling about ₱4,391,895,184.25. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
JUPA CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 117
- Total value
- ₱4,391,895,184.25
- Published flags
- 2
- Region
- Northern Samar 2nd DEO · Region VIII
Online presence
Google Maps: Jupa Construction★ 5 (3 reviews)Google Maps, 2026-10-22
GH8H+6XG, Bobon, Northern Samar
Licensed officers (PCAB)
- Junell Paul D. Alcera · Authorized Managing Officer (PCAB license 23577) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for JUPA CONST — not an accusation or finding of wrongdoing.
Score: 80.60 / 100 · Projects in sample: 117 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 61.2/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 61.2
- lateCompletedProjects
- 32
- onTimeCompletedProjects
- 63
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 112
- pastTargetOngoingProjects
- 17
- undatedCompletedProjectsExcluded
- 5
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 117
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 117
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.5/100 · Weight: 11%
- projects
- 117
- componentScore
- 99.5
- flagsPerProject
- 0.02
- publishedV2Flags
- 2
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 117
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 48 of 91 geotagged projects (largest by contract value) — Open full map
- ROAD WIDENING, SECONDARY ROADS, PANGPANG-PALAPAG-MAPANAS-GAMAY-LAPINIG RD., K0806+200-K0808+000; K0811+105-K0811+700, NORTHERN SAMAR 2ND DISTRICT25II0007 · ₱144,649,403.00 · mapped
- CONST. / IMPRVT. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS OF ECO-TOURISM ROADS, POBLACION-ROCK FORMATION ROAD, BIRI, NORTHERN SAMAR16I00061 · ₱133,467,119.97
- NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - ARTECHE, BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD, NORTHERN SAMAR 2ND DISTRICT21I00022 · ₱99,951,950.45 · mapped
- ROAD WIDENING, SECONDARY ROAD, SN POLICARPO-ARTECHE-LAPINIG RD, K0857+000-K0860+00022II0011 · ₱96,497,201.32 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS, RAWIS - CATUBIG RD., K0789+762.60 - K0791+000, K0793+950 - K0794+396, 2ND DISTRICT, NORTHERN SAMAR22II0059 · ₱93,721,679.13 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS, PANGPANG-PALAPAG-MAPANAS-GAMAY-LAPINIG ROAD, K0809+600-K0809+983, SECOND DISTRICT, NORTHERN SAMAR18II0060 · ₱91,652,916.71 · mapped
- CONSTRUCTION OF CONCEPCION-TAPUL-NAWI-PAGSANGHAN-ANAGASE-ST. NIÑO-MAYLOBE-SARAO CANVAIS-CARANAS ROAD, 0+000-0+977, PARANAS-MOTIONG, SAMAR22IK0030 · ₱86,844,878.83 · mapped
- NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0831+800 - K0832+92025I00093 · ₱84,830,036.81 · mapped
- ROAD WIDENING, SECONDARY ROADS, CATARMAN-LAOANG RD, K0778+000-K0779+630; K0783+961.3-K0785+992, 2ND DISTRICT NORTHERN SAMAR23II0010 · ₱82,524,980.05 · mapped
- CONSTRUCTION OF PAMBUJAN FLOOD CONTROL STRUCTURES AND DRAINAGE SYSTEM (DOWNSTREAM), DALE/PAMBUJAN RIVER BASIN, PAMBUJAN, NORTHERN SAMAR18II0043 · ₱80,021,855.26 · mapped
- CONSTRUCTION OF ROAD, GANDARA - MATUGUINAO - LAS NAVAS ROAD (NORTHERN SAMAR SIDE)25II0027 · ₱78,093,343.99 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, CONSTRUCTION OF LAS NAVAS RIVER CONTROL, LAS NAVAS, NORTHERN SAMAR19II0024 · ₱77,913,745.98 · mapped
- OO1: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, CALBAYOG - CATARMAN RD. K0795+204 - K0795+45524IJ0020 · ₱68,832,015.79 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, SECONDARY ROADS, PANGPANG, PALAPAG, MAPANAS, GAMAY, LAPINIG RD, K0830+205.30-K0830+55422II0058 · ₱68,789,794.43 · mapped
- PREVENTIVE MAINT. - SECONDARY ROADS (BASEY-MARABUT-PINAMITINAN RD), K0942+643-K0946+400, K0949+000-K0951+169, BASEY, SAMAR23IK0040 · ₱68,177,298.12 · mapped
- OO2: CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BARRUZ, PHASE II, MATUGUINAO, SAMAR25IJ0010 · ₱67,509,097.97 · mapped
- CONSTRUCTION OF ROAD, NAGOOCAN-OSANG-HINAGONOYAN-STA FE ROAD, CATUBIG, NORTHERN SAMAR23II0044 · ₱67,211,740.32 · mapped
- CONST. OF FLOOD CONTROL STRUCTURE, BRGY. MERCEDES, CATBALOGAN CITY, SAMAR23IK0105 · ₱66,536,695.08 · mapped
- ROAD WIDENING, SECONDARY ROADS, SAN POLICARPO - ARTECHE - LAPINIG ROAD, K0865+929 - K0867+772, 2ND DISTRICT, NORTHERN SAMAR19II0009 · ₱64,377,572.61 · mapped
- (RE-ADVERTISED) OO1: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - CALBAYOG - CATARMAN RD. K0803+042 - K0803+238, K0803+280 - K0803+31424IJ0007 · ₱60,182,879.06 · mapped
- CSSP: CONSTRUCTION OF MULTI-PURPOSE BUILDING, CALBAYOG DISTRICT HOSPITAL, CALBAYOG CITY, SAMAR23IJ0103 · ₱59,114,883.91 · mapped
- OO1: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, CALBAYOG - CATARMAN RD. K0794+470 - K0794+562, K0794+948 - K0795+00024IJ0027 · ₱57,254,433.36 · mapped
- Construction of Catubig Flood Control Structure and Drainage System, Catubig River Basin, Catubig, Northern Samar23II0015 · ₱54,377,358.61 · mapped
- Construction of Flood Control Structure along Gandara River, Barangay San Pelayo, Gandara, Samar23IJ0037 · ₱52,970,012.17 · mapped
- OO2: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GANDARA RIVER, PHASE II, BARANGAY SIDMON, GANDARA, SAMAR25IJ0024 · ₱52,639,652.20 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS, PANGPANG - PALAPAG - MAPANAS - GAMAY - LAPINIG RD., K0810+650 - K0810+801, 2ND DISTRICT, N. SAMAR21II0011 · ₱51,104,862.97 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS, PANGPANG - PALAPAG - MAPANAS - GAMAY - LAPINIG RD., K0812+318 - K0812+460, 2ND DISTRICT, NORTHERN SAMAR21II0012 · ₱51,076,095.14 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS, PANGPANG-PALAPAG-MAPANAS-GAMAY-LAPINIG RD, K0824+885-K0825+000; K0828+180-K0828+300, 2ND DISTRICT, NORTHERN SAMAR24II0007 · ₱48,984,780.54 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BICAL BRIDGE ALONG SAN JUANICO - BASEY - SOHOTON ROAD, ST. RITA, SAMAR25IK0036 · ₱48,969,709.77 · mapped
- CSSP-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST. OF ROAD, BRGY. LAM-AWAN TO BRGY. SAN ROQUE25IK0056 · ₱48,949,886.12
- OO1: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, CALBAYOG - CATARMAN RD. K0804+334 - K0804+52524IJ0030 · ₱48,947,712.00 · mapped
- Construction of Palapag Flood Control Structure and Drainage System, Palapag River Basin, Palapag, Northern Samar22II0020 · ₱48,748,724.40 · mapped
- OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CAPOOCAN - DAGUM DIVERSION ROAD (PHASE IV), SAMAR23IJ0087 · ₱48,559,201.84 · mapped
- Rehabilitation of Seawall, Brgy. Napalisan, Gandara, Samar23IJ0054 · ₱48,489,599.83 · mapped
- Construction of Flood Control Structure along Gandara River, Barangay Catorce De Agusto, Gandara, Samar24IJ0016 · ₱48,485,486.62 · mapped
- SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR) K0840+000 - K0840+107, K0840+850 - K0841+400, K0841+900 - K084224I00297 · ₱48,411,742.77 · mapped
- ROAD WIDENING, SECONDARY ROADS, PANGPANG-MAPANAS-GAMAY-LAPINIG RD., K0842+846 - K0845+000, GAMAY NORTHERN SAMAR22II0013 · ₱48,261,183.85 · mapped
- CONST. OF ROAD, BARANGAY GUIMBANGA TO BARANGAY ANTOL, CALBIGA, SAMAR, STA. 0+000.00-STA. 1+965.0024IK0077 · ₱48,207,930.62 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LAND SLIDE, SECONDARY ROADS, PANPANG-PALAPAG-MAPANAS-GAMAY-LAPINIG RD, K0815+840-K0815+880; K0828+540-K0828+690, PALAPAG, N. SAMAR22II0009 · ₱48,022,353.08 · mapped
- PREVENTIVE MAINTENANCE, SECONDARY ROADS, SAN POLICARPO-ARTECHE-LAPINIG RD, K0862+000-K0862+800, K0866+839-K0867+772, 2ND DISTRICT, NORTHERN SAMAR23II0003 · ₱47,999,617.96 · mapped
- Construction of Flood Control Structure along Gandara River, Barangay La Paz, San Jorge, Samar24IJ0015 · ₱47,991,241.99 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROAD, MAPANAS BY BYPASS ROAD, SAN ROQUE, NORTHERN SAMAR21II0054 · ₱47,780,502.83 · mapped
- CONSTRUCTION OF PALAPAG FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, PALAPAG RIVER BASIN, PALAPAG, NORTHERN SAMAR21II0023 · ₱47,185,390.47 · mapped
- CONSTRUCTION OF PALAPAG RIVER CONTROL, PALAPAG RIVER BASIN, PALAPAG, NORTHERN SAMAR20II0029 · ₱46,644,650.19 · mapped
- PREVENTIVE MAINTENANCE, PANGPANG-PALAPAG-MAPANAS-GAMAY-LAPINIG RD. K0798+(-619) - K0800+327, PALAPAG, NORTHERN SAMAR20II0003 · ₱46,578,328.84 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS, PANGPANG - PALAPAG - MAPANAS - GAMAY - LAPINIG RD., K0826+250 - K0827+076, K0827+102 - K0827+454, K0828+550 - K0828+800, K0834+300 - K0834+800, SECOND DISTRICT, NORTHERN SAMAR20II0002 · ₱46,577,309.30 · mapped
- CONSTRUCTION OF GAMAY RIVER CONTROL, GAMAY, NORTHERN SAMAR18II0056 · ₱45,582,258.59 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DALE RIVER CONTROL STRUCTURES (DALE RIVER BASIN), SAN ROQUE, NORTHERN SAMAR II15II0134 · ₱45,373,870.40 · mapped
- ROAD OPENING, CONCRETING OF LUBOG - LAGAWAN - GINAGDANAN ROAD, SAN ROQUE, NORTHERN SAMAR19II0048 · ₱45,280,009.38 · mapped
- REHAB./RECONST. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, RAWIS - CATUBIG ROAD, K0802+950 - K0803+150, CATUBIG, NORTHERN SAMAR II15II0167 · ₱40,889,783.96 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
