Rehabilitation of Dike along O'Donnell River, Sta. 9 + 983 to Sta. 10 + 303, Downstream of Bueno Bridge 1, Left Bank, Capas Tarlac,
Rehabilitation of Dike along O'Donnell River, Sta. 9 + 983 to Sta. 10 + 303, Downstream of Bueno Bridge 1, Left Bank, Capas Tarlac, is a DPWH-tracked public work in CAPAS (TARLAC), TARLAC, Region III. Reported contract value: ₱72,367,030.12. Status: Reported complete (DPWH). Contractor on record: 11-16 CONST. Figures trace to sumbong.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost






