CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, SACOBIA - BAMBAN RIVER, LEFT BANK, PACKAGE A, STA. 11+447.80 TO STA. 11+981.80, BARANGAY SANTA RITA, CONCEPCION, TARLAC
CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, SACOBIA - BAMBAN RIVER, LEFT BANK, PACKAGE A, STA. 11+447.80 TO STA. 11+981.80, BARANGAY SANTA RITA, CONCEPCION, TARLAC is a DPWH-tracked public work in Tarlac 2nd DEO, Region III. Reported contract value: ₱96,473,267.53. Status: Reported complete (DPWH). Contractor on record: ALEXI LOUISSE CONST. Figures trace to dpwh.
Total Contract Cost