ALEXI LOUISSE CONST is listed as a company organization in Philippine public procurement records on this site, with 58 linked DPWH project(s) totaling about ₱1,151,949,462.06. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
ALEXI LOUISSE CONST
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 58
- Total value
- ₱1,151,949,462.06
- Published flags
- 0
- Region
- Aurora DEO · Region III
Public Record Grade
A transparent, data-derived summary of reported public records for ALEXI LOUISSE CONST — not an accusation or finding of wrongdoing.
Score: 76.00 / 100 · Projects in sample: 58 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 56.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 56.7
- lateCompletedProjects
- 18
- onTimeCompletedProjects
- 29
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 57
- pastTargetOngoingProjects
- 10
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 58
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 58
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 58
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 58
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 58 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, SACOBIA - BAMBAN RIVER, LEFT BANK, PACKAGE A, STA. 11+447.80 TO STA. 11+981.80, BARANGAY SANTA RITA, CONCEPCION, TARLAC24CK0066 · ₱96,473,267.53 · mapped
- CONSTRUCTION OF CONCRETE SLOPE PROTECTION AND ROAD DIKE ALONG PARUA RIVER, BRGY. MALONZO SECTION, PHASE 2, BAMBAN, TARLAC23CK0118 · ₱96,441,047.07 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BAYANIHAN, MARIA AURORA, AURORA25CN0156 · ₱54,040,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. DIARABASIN, DIPACULAO, AURORA23CN0077 · ₱49,500,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, MARIA AURORA, AURORA25CN0153 · ₱49,005,176.81 · mapped
- CONSTRUCTION OF ABITONAN RIVER CONTROL STRUCTURE, DIPACULAO, AURORA24CN0017 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. CALAOCAN, DIPACULAO, AURORA24CN0072 · ₱48,250,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. DINADIAWAN, DIPACULAO, AURORA24CN0074 · ₱48,250,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. BIANOAN, CASIGURAN, AURORA24CN0068 · ₱47,318,449.04 · mapped
- REHABILITATION OF EXISTING DIKE ALONG TINANG CREEK (LEFT & RIGHT BANK), D/S OF STA. MONICA BRIDGE, CONCEPCION, TARLAC24CK0030 · ₱46,747,690.61 · mapped
- STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTER/QUARANTINE FACILITIES, DIPACULAO, AURORA21CN0138 · ₱34,740,000.00 · mapped
- CONSTRUCTION OF 2 STOREY 10 CLASSROOM BUILDING, MARIA AURORA NATIONAL HIGH SCHOOL, MARIA AURORA, AURORA23CN0199 · ₱29,590,538.31 · mapped
- CONSTRUCTION OF CALABUANAN TO SETAN FLOOD CONTROL, BALER, AURORA19CN0041 · ₱29,400,000.00 · mapped
- REPAIR/REHABILITATION/RECONSTRUCTION OF NATIONAL ROAD WITH SLIPS, SLOPE COLLAPSED AND LAND SLIDE ALONG ROMBLON-COGON SABLAYAN ROADK0005+938.90 - K0005+980.00, ROMBLON, ROMBLON22EH0057 · ₱21,502,656.61 · mapped
- CONSTRUCTION OF 2 STY 8 CL SCHOOL BUILDING, MIJARES NATIONAL HIGH SCHOOL, BRGY. MIJARES, DIPACULAO, AURORA19CN0152 · ₱20,011,719.21 · mapped
- CONSTRUCTION OF FLOOD CONTROL, BRGY. DITEKI, SAN LUIS, AURORA20CN0106 · ₱19,800,000.00 · mapped
- CONSTRUCTION OF ROAD, BARANGAY LABOY, DIPACULAO, AURORA21CN0096 · ₱19,800,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL, BRGY. DIAMANEN TO BRGY. PUANGI, DIPACULAO, AURORA19CN0051 · ₱19,600,000.00 · mapped
- CONSTRUCTION OF ROAD, BRGY. DIAMANEN, DIPACULAO, AURORA24CN0134 · ₱19,519,912.12 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. LIPIT, DIPACULAO, AURORA22CN0183 · ₱19,070,387.31 · mapped
- CONCRETING OF BRGY. DITUMABO FMR, BRGY. DITUMABO, SAN LUIS, AURORA24CN0208 · ₱14,925,000.00 · mapped
- CONSTRUCTION OF ROAD, BARANGAY DITALE, DIPACULAO, AURORA25CN0081 · ₱14,405,087.90 · mapped
- CONSTRUCTION OF MUNICIPAL SLAUGHTERHOUSE, BALER, AURORA20CN0101 · ₱14,403,220.61 · mapped
- CONCRETING OF BRGY. LABOY TO BRGY. IPIL FMR, BRGY. LABOY AND BRGY. IPIL, DIPACULAO, AURORA20CN0158 · ₱12,288,014.35 · mapped
- CONSTRUCTION OF LIWAYWAY - MALIGAYA ROAD, BARANGAY MUCDOL, DIPACULAO, AURORA21CN0088 · ₱11,880,000.00 · mapped
- CONSTRUCTION OF 2-STOREY 8-CL SCHOOL BUILDING, MARIANO D. MARQUEZ HIGH SCHOOL, DINALUNGAN, AURORA17CN0134 · ₱10,446,119.24 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BIRDGES - AGUANG BR. (B03015LZ) ALONG BALER-CASIGURAN RD (BALER-DINADIAWAN)22CN0025 · ₱10,110,087.05 · mapped
- CONCRETING OF BRGY. MUCDOL FMR, BRGY. MUCDOL, DIPACULAO, AURORA21CN0123 · ₱9,950,000.00 · mapped
- CONSTRUCTION OF ROAD, BRGY. LABOY, DIPACULAO, AURORA18CN0114 · ₱9,900,000.00 · mapped
- CONSTRUCTION OF LABOY - CABITUCULAN ROAD, BRGY. LABOY, DIPACULAO, AURORA21CN0087 · ₱9,900,000.00 · mapped
- CONCRETING OF ROAD, BRGY. DIBUTUNAN, DIPACULAO, AURORA19CN0117 · ₱9,900,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL, BRGY. CALOOCAN, DIPACULAO, AURORA18CN0109 · ₱9,900,000.00 · mapped
- CONSTRUCTION OF ROAD, BRGY. BAYABAS, DIPACULAO, AURORA23CN0025 · ₱9,800,000.00 · mapped
- CONCRETING OF DINADIAWAN - UPPER BULOS ROAD, BRGY. DINADIAWAN, DIPACULAO, AURORA20CN0049 · ₱9,800,000.00 · mapped
- CONCRETING OF SO. BUGALLAN ROAD, BRGY. DIMABUNO, DIPACULAO, AURORA18CN0035 · ₱9,800,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL, BRGY. DINADIAWAN, DIPACULAO, AURORA19CN0052 · ₱9,800,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. DITALE, DIPACULAO, AURORA22CN0111 · ₱9,800,000.00 · mapped
- CONCRETING OF ROAD, BRGY. LABOY, DIPACULAO, AURORA18CN0094 · ₱9,800,000.00 · mapped
- CONSTRUCTION OF ROAD, BARANGAY DIANED, DIPACULAO, AURORA25CN0076 · ₱9,702,320.88 · mapped
- CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY DIKAPINISAN, SAN LUIS, AURORA23CN0156 · ₱9,609,080.42 · mapped
- CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY SABANG, BALER, AURORA23CN0153 · ₱9,607,989.94 · mapped
- CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY DINADIAWAN, DIPACULAO, AURORA23CN0155 · ₱9,606,345.29 · mapped
- CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY BAYANIHAN, MARIA AURORA, AURORA23CN0154 · ₱9,604,803.02 · mapped
- CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY CABITUCULAN WEST, MUNICIPALITY OF MARIA AURORA, AURORA PROVINCE23CN0157 · ₱9,604,291.94 · mapped
- CONSTRUCTION OF ROAD, BARANGAY LABOY, DIPACULAO, AURORA25CN0083 · ₱9,600,644.13 · mapped
- CONSTRUCTION OF WATER SYSTEM, BRGY. DINADIAWAN, DIPACULAO, AURORA23CN0091 · ₱9,506,094.33 · mapped
- CONSTRUCTION OF CLASSROOMS (3-UNITS UNIQUE WORKSHOP 7 X 22.5), MARIANO D. MARQUEZ MEMORIAL NATIONAL HIGH SCHOOL, DINALUNGAN, AURORA17CN0165 · ₱8,244,621.48 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY DITAWINI, DINALUNGAN, AURORA25CN0121 · ₱6,923,888.50 · mapped
- CONSTRUCTION OF BRIDGE, BRGY. TOYTOYAN, DIPACULAO, AURORA24CN0096 · ₱5,694,448.22 · mapped
- CONSTRUCTION OF 1 STY 3 CL SCHOOL BUILDING PUANGI ELEMENTARY SCHOOL, DIPACULAO, AURORA19CN0155 · ₱5,263,003.72 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →