Flood Control and Drainage18HH0086

CONSTRUCTION OF SLOPE PROTECTION (RETAINING WALL AT ADLAON ELEMENTARY SCHOOL), BRGY. ADLAON, CEBU CITY

CONSTRUCTION OF SLOPE PROTECTION (RETAINING WALL AT ADLAON ELEMENTARY SCHOOL), BRGY. ADLAON, CEBU CITY is a DPWH-tracked public work in Cebu City DEO, Region VII. Reported contract value: ₱979,949.93. Status: Reported complete (DPWH). Contractor on record: BT CONST AND GEN SERVICES. Figures trace to dpwh.

Cebu City DEO, Region VII
Region: Region VII

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱45,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-18-0032654 · ₱214,303 · release to the district office, not itemized per project

    Possible match · score 0.69

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱979,950 · BT CONSTRUCTION AND GENERAL SERVICES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-03-17 → 2025-01-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Cebu

Based on the coordinates published with the DPWH record and NOAH file Cebu.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF SLOPE PROTECTION (RETAINING WALL AT  ADLAON ELEMENTARY SCHOOL), BRGY. ADLAON, CEBU CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱45,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure at Brgy. Budlaan , Cebu City
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-18-0032654

₱214,303.00 · FY2018

Released to Minalabac National High De School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction of Slope Protection (Retaining Wall a

₱979,949.93 · BT CONSTRUCTION AND GENERAL SERVICES

4. Implementation

Contract Amount

₱979,949.93

Progress

Reported complete (DPWH)

Start Date

July 31, 2018

Target End

September 13, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.