RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, DOMALANDAN BR. (B00896LZ) ALONG LINGAYEN-LABRADOR DIV RD (PHASE IV)
RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, DOMALANDAN BR. (B00896LZ) ALONG LINGAYEN-LABRADOR DIV RD (PHASE IV) is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱28,268,710.00. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: ALPHATEC CHEMICAL CORP. Figures trace to dpwh.
Total Contract Cost
